影音先锋男人资源在线观看,精品国产日韩亚洲一区91,中文字幕日韩国产,2018av男人天堂,青青伊人精品,久久久久久久综合日本亚洲,国产日韩欧美一区二区三区在线

冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog)

上傳人:ca****in 文檔編號(hào):73941060 上傳時(shí)間:2022-04-12 格式:DOC 頁數(shù):12 大?。?5.50KB
收藏 版權(quán)申訴 舉報(bào) 下載
冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog)_第1頁
第1頁 / 共12頁
冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog)_第2頁
第2頁 / 共12頁
冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog)_第3頁
第3頁 / 共12頁

本資源只提供3頁預(yù)覽,全部文檔請(qǐng)下載后查看!喜歡就下載吧,查找使用更方便

10 積分

下載資源

資源描述:

《冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog)》由會(huì)員分享,可在線閱讀,更多相關(guān)《冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog)(12頁珍藏版)》請(qǐng)?jiān)谘b配圖網(wǎng)上搜索。

1、冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog) Winter construction program - lnlh2003's Journal - NetEase blog, NetEase news micro-blog mailbox Lightning mail Album adhere to principles of truth and right Mobile mail An icon Fantasy

2、 More blogs, blogs, home pages Blog topic Hot topics Blog rape land Find friends Blogosphere Blog style Mobile Blog SMS blogging Mail write Blog copy, photography, photography exhibition area Daily topics Character annals Interview Homework search blog sea

3、rch blog and take a look at this blog attention style no longer difficult to move to send Lomo card registration login display a close | Pile foundation slope supporting engineering real emotion virtual world virtual real self guided self governance The album music collection on my blog log lo

4、g lnlh2003 With the attention he. Latest log Construction organization design, construction enterprise contract management, civil engineering quantity calculation rules, cited reference scaffolding construction program, gravel pile technical disclosure, eleven bloggers recommend Related

5、logs Random reading Rent both sad who knows? 10 beautiful coat jacket to help you withstand the cold wave of the Millennium 7 details to decipher whether men call? Crack "before dawn", the formation of word of mouth mystery, cool without losing style Does the pressure on the London Daren St

6、reet make your hair look white? Home recommendation My husband took vocalizations when bask in Japanese food price customized ringing tone (Figure) around us to see Taiwanese male white-collar Li 'Han Hong' return to the mainland disaster on the road in a car accident hit kill more "Why College S

7、tudents Field inspection report on temporary power consumption scheme Winter construction program construction 2009-06-24 13:45:08 read 255 review 0: big and small subscriptions 5, winter construction plan 5.1 after winter, manual excavation of bored piles, construction conditions have c

8、hanged the following: After 5.1.1 enters the winter, the temperature drops, the ground produces the frozen layer construction, the excavation difficulty increases. 5.1.2 enters the water temperature is reduced after the winter, well point dewatering pipes, water supply pipe, water pump, easy o

9、f ice, cracking. When the 5.1.3 enters the winter construction, the construction efficiency is reduced. After entering the winter construction of 5.1.4, the construction will be stopped in case of bad weather. After the resumption of work, measures such as on-site cleaning and other measures s

10、hould be taken. 5.2, in order to ensure the quality of construction work, ensure safety in production and ensure the construction period, take the following winter construction measures. 5.2.1 guarantee the construction quality measures of steel cage. The finished material and semi-finished

11、 material of the reinforcing steel bar should be piled up neatly, covered and laid in place to prevent the corrosion of the rebar due to the rain and snow. The cage shall be cleaned before the steel cage is hoisted. For semi-finished products, more cage, because of rain and snow and rust, rust remov

12、al work should be carried out in a timely manner. In the construction of reinforcing steel welding, when the ambient temperature is lower than 5 DEG C, the steel bar shall be welded by negative temperature welding of the steel bar, and the welder engaged in the welding of the steel bar must hold the

13、 certificate of steel welder examination. Safety technical measures shall be formulated and implemented to strengthen the labor protection of welders and prevent accidents such as burns, electric shocks and fires. Before welding the steel bar, the welding shall be carried out according to the constr

14、uction conditions, and the welding can be carried out after qualified. The welder shall check the appearance quality of all joints after the welding, and reject the unqualified ones. When welding with negative temperature, the welding parameters should be adjusted so that the welding seam and heat a

15、ffected zone can be cooled slowly. When winds exceed four, wind protection measures should be taken. After welding, the cold joint should be avoided to touch the ice and snow. Welding shall not be applied when ambient temperature is lower than 20 degrees centigrade. 5.2.2 steel negative temperatu

16、re arc welding 5.2.2.1 scope: Steel less than 22mm in diameter with a welding 5.2.2.2: j506, steel electrode selection 5.2.3 preparation before welding Before welding, the rust, slag and oil contamination of the welding area of the reinforcing steel bar must be removed, and the distortio

17、n and bending of the end of the steel bar should be straightened or removed by 5.2.3.1. 5.2.3.2 steel lap welding should use one side welding, can not carry out single side welding or double face welding. 5.2.4 welding process According to the steel grade, diameter, joint type and welding p

18、osition, welding current and electrode diameter selection, suitable welding, welding process should be adopted in multi temperature control, it is necessary to prevent cooling after welding speed is too fast, but also to prevent joint overheating. Welding process shall meet the following requirement

19、s: When welding, 5.2.41 shall be fixed at two points. Fixed by manual assistance, fixed, when the joint position is good after welding (ensure steel coaxial). 5.2.4.2 welding, the arc should begin in the end of the lap bar, in the end should be reinforced lap arc crater shall be filled up.

20、5.2.4.3 lap welding, the first layer of weld arc from the middle first, then to the ends of the arc. The first layer of pedlar shall have sufficient penetration, the main weld and weld positioning, especially in the beginning and terminal position of welding seam, should be good fusion. After each l

21、ayer of welding seam welding, stratified temperature control welding. The interlayer temperature is controlled between 150 DEG C and 350 DEG C, so as to play a role of slow cooling. H the weld thickness of 5.2.4.4 lap joints shall be no less than 0.3 steel bars; the width of welds shall be no les

22、s than 0.7, and the diameter of the steel bars shall be no less than 6. 5.2.4.5 grade reinforced bar joints of multilayer welding, the temper bead welding method ", namely: the final temper bead length than before the bead at both ends of the shortened 4 - 6mm. 5.2.5 quality acceptance 5.2.

23、5.1 sampling: visual inspection shall be carried out separately or visually after the joint has been removed. Tensile test, from the appearance of qualified finished products, cut three specimens per batch for tensile test. Take a tensile test at each of the 300 joints 5.2.5.2 visual inspection:

24、visual inspection results, should meet the following requirements: the weld surface formation, no sag, large overlap. There must be no crack at the joint. The undercut depth, the number of holes, the amount of slag and the size deviation of the joint shall not exceed the specified value. The appeara

25、nce of unqualified joints, after modification or reinforcement, can be submitted for the two acceptance. 5.2.6 connector notes When the steel bar is welded, the welded joints arranged in the same steel cage shall be staggered. In the range of 35 times of the diameter of the reinforcing bar (no

26、 less than 500mm), a steel bar shall not have two joints, and the sectional area of the joint reinforcement shall be 50% of the total sectional area of the steel bar. 5.3 ensure pore forming measures 5.3.1 construction, for individual prone to collapse of the pile, the use of large displacemen

27、t pumps, sedimentation tanks need to set up a shelter, as far as possible to avoid the precipitation pond icing. 5.3.2 uses steam (hot water) heating method on water pipeline to ensure smooth and timely cleaning pipeline residual water and sediment suspension transitions. Prevent the pipe from fr

28、eezing and cracking. 5.4 ensure the quality of perfusion construction 5.4.1 the construction site of the reasonable control of the concrete pouring speed, strictly control the construction process, coordinate the commercial concrete supply time, reduce or avoid the waiting time of the tanker w

29、ith concrete, which taking concrete into the hole temperature meets the requirement. 5.4.2 uses the hot water to the catheter and joints, threaded parts timely cleaning, prevent adhesion of ice, shorten the filling time. After the concrete is finished, the pipe is cleaned in time, and a special p

30、ipe rack is arranged on the spot. The pipe is sealed on the pipe rack to avoid the contact between the pipe and the ground mud. The 5.4.3 site pile pile buried below the surface (in Dalian, following the provisions of the deep freeze) into 24 piles of empty pile in time after backfilling, filling

31、 height of pile head height was 1.0m. 5.4.4 site set up a person to do a daily temperature record. 5.5 winter season guarantee measures 5.5.1 construction site to take measures to keep people warm 5.5.1.1 construction site will set up 3 movable rooms, with boilers for the on-site constru

32、ction workers to take turns heating. The 5.5.1.2 of each worker issued coats, gloves, cotton padded cap, masks and other warm supplies. 5.5.2 ensure manpower and equipment resources 5.5.2.1 50% - 100% more during the winter construction site construction and management personnel involved in

33、 construction, ensure the construction efficiency. 5.5.2.2 equipment operating units increased nuanpeng. 5.5.2.3 construction of vulnerable parts, pipelines, tools must be in stock, the construction site pipeline leakage, timely replacement. 5.5. 2.4 machines ready to be put into site op

34、eration shall be replaced with fuel, hydraulic oil and lubricating oil suitable for use in winter before the start of operation. Regular inspection and maintenance of equipment shall be carried out to ensure the normal operation of the equipment. 5.5.3 logistics support 5.5.3.1 guarantee the s

35、upply of labor protection products during construction. 5.5.3.2 improve staff food supply standards. 5.5.3.3 staff quarters are equipped with heating facilities to purchase heating boilers. 5.6 winter construction safety measures 5.6.1 fire safety measures 5.6.1.1 construction site an

36、d living area are strictly prohibited from private automatic fire. 5.6.1.2 establish a winter fire safety leading group, responsibility to people at any time check, put an end to fire. 5.6.1.3 formulate safety fire emergency plan, and site construction personnel safety education, clear fire em

37、ergency measures. 5.6.1.4 construction site and living area to purchase fire equipment, safety education for the construction staff, the use of fire control facilities. 5.6.1.5 oxygen, acetylene bottles and other flammable and explosive materials, away from fire storage. 5.6.1.6 constructio

38、n site and living area heating, fire, special care to prevent fire and carbon monoxide poisoning. 5.6.2 construction site and living areas are prohibited unauthorized use of electrical heating. 5.6.3 climbing and mechanical work before the construction of special arrangements to clean up the s

39、cene, the operating surface frost, snow and ice floes clean, you can carry out construction. 5.6.4 regular inspection of equipment, found hidden trouble in a timely manner rectification. 5.6.5 field wind over 5 stop lifting operation. 0 | share: reading (255) | comments (0) | references (0) |

40、Report Field inspection report on temporary power consumption scheme today in history Related articles Construction technology - reinforced concrete precast pile, reinforced concrete wall, column steel positioning construction method, automatic numerical control steel reinforcement const

41、ruction technology, steel reinforcement length calculation concept Recent reader After logging in, you can leave a footprint here. Sdzy8619 wyjdldz hskyshfy liuji010 ex2046 until the flowers comment Click on the login | nickname: Cancel the verification code: change it Previous pag

42、e 1... -1-1-1-1-1-1-1... -1, next page footer Company profile - contact method - Recruitment Information - customer service - related laws - blog style - Mobile Blog - subscribe to this blog NetEase Inc. All rights reserved; ? 1997-2010 * information tips Style control, have you made a difficult decision today? Mobile phone blogging, Word, blogging, LiveWriter, blogging

展開閱讀全文
溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

相關(guān)資源

更多
正為您匹配相似的精品文檔
關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號(hào):ICP2024067431號(hào)-1 川公網(wǎng)安備51140202000466號(hào)


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺(tái),本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請(qǐng)立即通知裝配圖網(wǎng),我們立即給予刪除!