1.5兆牛擺動剪切機(jī)構(gòu)設(shè)計(jì)【說明書+CAD】,說明書+CAD,1.5兆牛擺動剪切機(jī)構(gòu)設(shè)計(jì)【說明書+CAD】,擺動,剪切,機(jī)構(gòu),設(shè)計(jì),說明書,仿單,cad
鞍山科技大學(xué)本科生畢業(yè)設(shè)計(jì) 第IV頁
1.5兆牛擺動剪切機(jī)構(gòu)設(shè)計(jì)
摘要
1.5兆牛擺動剪切機(jī)是安裝在500型鋼熱連機(jī)前,用于切頭切尾和卡鋼事故的處理剪。隨著國民經(jīng)濟(jì)的發(fā)展,對型鋼產(chǎn)品數(shù)量的要求更高。本設(shè)計(jì)為型鋼設(shè)計(jì)切頭的擺動剪,設(shè)計(jì)中對擺動剪的局部做了改進(jìn)。
首先,本文討論了型鋼軋機(jī)在國民經(jīng)濟(jì)中的地位,并對300/500機(jī)組平面布置示意圖的概況進(jìn)行了整體的介紹。并介紹了擺動剪的結(jié)構(gòu)特點(diǎn)和研究的內(nèi)容與方法。根據(jù)現(xiàn)有設(shè)備狀況,對設(shè)備生產(chǎn)中存在的問題進(jìn)行分析,對主要部件結(jié)構(gòu)做了合理的選用。然后,根據(jù)機(jī)組原始參數(shù)初選主電機(jī)容量,對其進(jìn)行發(fā)熱校核和過載校核,對主要零件進(jìn)行強(qiáng)度校核。對齒輪做了強(qiáng)度計(jì)算,對曲軸計(jì)算了彎曲應(yīng)力,彎扭合成應(yīng)力;校核了危險(xiǎn)斷面;以及滑塊損壞的改進(jìn)設(shè)計(jì)及潤滑方法,簡單計(jì)算擺動剪的可靠性和經(jīng)濟(jì)評價(jià)。
通過以上工作,1.5兆牛擺動剪切機(jī)在使用壽命、產(chǎn)品質(zhì)量理論上應(yīng)該有一定的提高。設(shè)計(jì)內(nèi)容有實(shí)際價(jià)值。該剪作為加熱爐前方坯切頭飛剪。
關(guān)鍵詞:剪切機(jī),擺動,主傳動
A Design of 1.5 Swing Scissors
1.5 swing scissors is installed before the 500 sharp steel of hot continuous rolling mills, which is used to cut the head and end of the steel and deal with the jamming of the steels.With the development of the national economy, the request of the sharp steels’s quality is higher than before. In the thesis, the cutting of the head of the 1.5 swing scissors is researched, and makes some improvments of partial strcture.
First, the thesis has discussed the position of the rolling mill of sharp steel in the national economy, and makes the general instruction for 300/500 unit plane arrangement. Next, introducing the structural characteristic of the swing cutting and the method and content of the research .According to exising equipment condition, analysing the exist problem in equipment production, the strcture of the major parts are reasonable to choosed. Then,according to the primitive parameter of the unit, I primarily choose the capacity of the main motor, and make the heat examination and overload examination, choose if satisfying the requirement, otherwise choose again until the examination is satisfyed. I make the strength examination for major element. As to gears, I make the strength calulation; as to crank, I caculated the curving stress and the crooked synthesis stress, examinationing the dangerous cross section, as well as the improment of the damages of the slide and the method of lubrication. Finally I caculated the economy appraisal and the reliablity of swing scissors.
Through the work of this thesis, 1.5 swing scissors should certain raise in service life and product quality theoretically, but need the unceasing improvement in practice.
Key-word: scissors, swing, main drive
譯文
軋制過程中的熱傳遞
一. 熱帶軋制的溫度變化
板坯再加熱到所要求的溫度后進(jìn)行軋制。一個(gè)典型的熱帶軋制工藝包括以下幾個(gè)主要步驟:
(1) 板坯軋制前用高壓水除鱗系統(tǒng)除鱗,有時(shí)采用立輥軋機(jī)同時(shí)除鱗。
(2) 粗軋成19~40mm后的中間料。粗軋過程通常伴隨立輥和道次間的除鱗操作。
(3) 將中間料從粗軋機(jī)運(yùn)至安裝在精軋機(jī)前的飛剪處。飛剪用來剪切料頭和料尾。
(4) 中間料在進(jìn)精軋機(jī)組前的除鱗。
(5) 精軋至所要求的厚度。機(jī)架間可能進(jìn)行除鱗,有時(shí)也可能進(jìn)行帶鋼冷卻。
(6) 軋材在輸出輥道上的空冷和水冷。
(7) 軋材的卷取。
在軋制工藝過程中,軋件向其周圍物質(zhì)進(jìn)行各種熱傳遞。一些損失的熱量由軋件變形所產(chǎn)生的熱予以彌補(bǔ)。
熱帶軋制過程中,軋件溫度降低和升高的主要因素通??梢詤^(qū)分如下:
(1) 熱輻射引起的溫降。
(2) 熱對流引起的溫降。
(3) 水冷引起的溫降。
(4) 向工作輥和輥道熱傳遞導(dǎo)引起的溫降。
(5) 力學(xué)加工和摩擦引起的溫升。
關(guān)于這些因素的分析簡述如下。
二. 熱輻射引起的溫降
采用兩種方法進(jìn)行熱輻射引起的溫降公式的推導(dǎo)。
第一種方法忽略了材料內(nèi)部的溫度提督,利用斯蒂芬-玻爾茲曼定律計(jì)算輻射到環(huán)境中的熱量為:
q=S
式中 ——輻射體的表面積,m2;
q——從物體輻射的熱量,J;
S——斯蒂芬-玻爾茲曼常數(shù);
T——軋件在t時(shí)刻的溫度,K;
Ta——環(huán)境溫度,K;
t——時(shí)間,s;
——輻射系數(shù)。
物體損失的熱量由下式給定:
q=
式中 c——軋件質(zhì)量熱容,J/(kg·K);
Vr——輻射體的體積,m3
——軋件的密度,kg/m3。
考慮到熱平衡條件q=q及式1-1和式1-2,可以計(jì)算出溫降速度ar:
ar=
通常假設(shè)Ta
收藏