影音先锋男人资源在线观看,精品国产日韩亚洲一区91,中文字幕日韩国产,2018av男人天堂,青青伊人精品,久久久久久久综合日本亚洲,国产日韩欧美一区二区三区在线

中國三峽大壩畢業(yè)設(shè)計外文翻譯

上傳人:仙*** 文檔編號:28733831 上傳時間:2021-09-09 格式:DOC 頁數(shù):8 大小:40.53KB
收藏 版權(quán)申訴 舉報 下載
中國三峽大壩畢業(yè)設(shè)計外文翻譯_第1頁
第1頁 / 共8頁
中國三峽大壩畢業(yè)設(shè)計外文翻譯_第2頁
第2頁 / 共8頁
中國三峽大壩畢業(yè)設(shè)計外文翻譯_第3頁
第3頁 / 共8頁

下載文檔到電腦,查找使用更方便

15 積分

下載資源

還剩頁未讀,繼續(xù)閱讀

資源描述:

《中國三峽大壩畢業(yè)設(shè)計外文翻譯》由會員分享,可在線閱讀,更多相關(guān)《中國三峽大壩畢業(yè)設(shè)計外文翻譯(8頁珍藏版)》請在裝配圖網(wǎng)上搜索。

1、附錄 外文原文及翻譯 Three Gorges Dam, China Published: August 10, 2010 Edited: August 10, 2010 Lead Author: Cutler Cleveland Three Gorges Dam, China (304418" North, 1111627" East), crosses the Yangtze River at Sandouping, Yichang, Hubei province, China. The dam’s name refers to the majestic limestone

2、 cliffs of the Qutang, Wu, and Xiling gorges, which stretch for about 200 kilometers (124 miles) from Fengjie, in Sichun province, to Yichang, in Hubei province, in Chinas heartland. The Yangtze is the longest river in Asia and the third longest in the world, running 6,211 kilometers (3,860 miles) f

3、rom Qinghai Province in the Tibetan Plateau to the East China Sea near Shanghai. The river’s watershed is massive, spanning 1,722,155 sq.km (1,070,147 sq. miles) with nearly 400 million inhabitants. On April 3, 1992, the National Peoples Congress of China approved the construction of the worlds la

4、rgest and most controversial hydroelectric facility at Three Gorges. The reservoir began filling on June 1, 2003, and construction is scheduled to be finished by May 2006. Full power generation will be reached in 2009. There are 26 power generating units planned, each with generating capacity of 700

5、 megawatts (MW), which should produce an average of 84.7B kilowatt-hours per year (kWh/yr) from 2008 from a total generating capacity of 18,200 gigawatts (GW). Three Gorges would then surpass the 14,000MW Itaip dam located on the Paran River at the Brazil/Paraguay border. The latest government figur

6、es have put a price tag of US$25 billion on the project, although other estimates put the actual cost much higher. The reservoir is 630km long and an average of 1.3km wide, while the dam wall is 185m high and almost as deep, stretching 2.3km across the valley. About 27 million cubic meters of conc

7、rete have gone into the structure since work began; thats more than eight times as much as has been poured into the Hoover dam on the Colorado River and twice the amount of concrete in the Itaip dam. The Three Gorges project has been engineered to store over 5 trillion gallons of water and to withst

8、and an earthquake of 7.0 on the Richter scale. There about 50,000 other dams on the Yangtze River, mostly along tributaries of the main river, that were built in the past 50 years to create freshwater reservoirs. The freshwater storage capacity has skyrocketed from 0.06 cubic kilometers in 1950 to

9、 180 cubic kilometers in 2002. When the reservoir behind the Three Gorges Dam is full, it will add up to 40 cubic kilometers to that total. Benefits from the Three Gorges Project To Chinas leaders, the Three Gorges dam will provide a foundation for the nation’s future economic prosperity. The po

10、wer will also help meet Chinas rapidly growing energy demand. Just as important, the transmission lines that are being developed to transport electricity from the project to the rest of the country will help to create a national grid, with the Three Gorges at its heart Transportation of people and

11、goods will be greatly enhanced. The reservoir will allow 10,000-ton freighters to enter the nations interior, which currently limits access to boats under 1,500 tons. Vessels will be able to navigate from Shanghai up to Chongqing, around 2000km from the sea. It could become an even more important tr

12、ansport artery if sufficient facilities are put in place to integrate cargo transport on the river with major rail and road intersections. The government and companies involved in the development of the Three Gorges dam are also keen to promote the project by developing it as a tourist attraction. T

13、our boats now offer trips on the reservoirs in order to allow foreign and domestic tourists to appreciate what are being advertised as ‘lofty gorges projecting peaceful lakes’. The dam is also intended to provide major flood control benefits. Historically, the population in the middle and lower re

14、aches of the Yangtze River suffered tremendous losses from flooding both in human lives and property. For example, the massive flooding of the Yangtze River in 1931 caused more than 3 million deaths from flooding and starvation. The government also notes that the dams power generation potential of

15、 84.7BkWh/yr is the energy equivalent of burning 50 million tons of coal or 25 million tons of crude oil. Thus, the switch to cleaner hydroelectric power would have the effect of cutting 100 million tons of carbon dioxide, up to two million tons of sulfur dioxide, ten thousand tons of carbon monoxid

16、e, 370,000 tons of nitrogen oxide, and 150,000 tons of particulates annually from the atmosphere. Social and Environmental Concerns Critics of the Three Gorges project argue that the project’s costs may outweigh the benefits, the latter of which have allegedly been exaggerated by the government.

17、 The Three Gorges Dam project has become a symbol of national unity and strength for the ruling communist party. As a result, critics charge that many of the controversies surrounding the project are glossed over or ignored. In an address to the engineers of the dam, then Premier Li Peng, himself a

18、power engineer by training, said the scale of the project was proof to the world of Chinas newfound strength. "The damming of the Yangtze is of great political and economic significance ... It proves to the whole world the Chinese peoples capability of building the worlds first-rate hydroelectric pr

19、oject". The construction of the dam has thus become as much a celebration of Chinese nationalism and its political leadership as it is a massive power and engineering feat. Foreign perception of the project has suffered from the reputation of its principal proponent in Beijing, Li Peng. Li, whom s

20、ome historians hold responsible for the 1989 massacre in Tiananmen Square, championed the idea of the dam to guarantee Chinas energy supply amid the internal political repression and international isolation that followed Tiananmen. Li was the driving force behind the approval of the project in 1992

21、by the National People’s Congress despite no votes or abstentions from a third of the delegates—a rare display of dissent in the Congress. Resettlement is a major source of controversy. More than 1.2 million will have to be resettled before the Yangtze valley is submerged. Entire villages and part

22、s of major cities have been relocated. Critics claim that those forced out of the area have not been adequately compensated, particularly as the land they lost was highly fertile. But the government insists that the scale of its compensation package demonstrates its commitment to helping those affec

23、ted improve their standard of living. Upwards of 1,000 archeological sites will be submerged beneath the reservoir. Ancestral burial grounds and centuries-old temples, fossil remains, and archeological sites dating as far back as the Paleolithic Age risk being lost from public access and scholarly

24、 pursuit if they are not unearthed and relocated before the waters rise. The government has taken measures that it claims will mitigate these losses. There is also concern about the impact the project will have on biological diversity. The baiji dolphin, the ancient river sturgeon and the finless

25、porpoise depend on the Yangtze for their survival. The population of Siberian cranes in Poyang Lake will also be affected by the dam. Sedimentation of the reservoir is also a serious challenge. The flow of the Yangtze carries with it the fifth-largest sediment discharge of any river in the world,

26、equivalent to about 4 percent of all river-borne sediment discharged to all the oceans of the world. Sediment buildup behind the dam and throughout the reservoir would effect the overall storage capacity of the reservoir. The loss of storage capacity would directly result in a decrease in project’s

27、flood control capability. The high rate of sediment deposit has already affected the diversion channel and is expected to compromise operation of the dam sooner and more seriously than had been anticipated. The Yangtze River branches out into a broad estuary that stretches 655 kilometers into the

28、East China Sea, and forms one of the largest continental shelves in the world. Over half of the Yangtze’s annual sediment load is deposited in the estuary. The health of the estuary depends on the delivery of this sediment because a significant relationship exists between intertidal wetland growth r

29、ate and riverine sediment supply. Yet, due to the Three Gorges project and other dams, the sediment accumulation rate in all reservoirs on the river has increased from close to zero in 1950 to more than 850 * 106 tons per year in 2003. This is causing erosion of the wetland habitat there, which prov

30、ides nurseries for fish and resting areas for migratory birds and is considered one of the worlds most important wetland ecosystems. A similar effect was seen on the Nile River after the Aswan Dam in Egypt was completed. 譯文: 中國三峽大壩 發(fā)表于:8月10日,2010年 編輯于:8月10日,2010年 首

31、席作者: 約翰克利夫蘭 中國三峽大壩 (北緯3044 18”、東經(jīng)1111627”), 在中國湖北宜昌三斗坪穿越長江。大壩的名字代表的是雄偉的石灰?guī)r山崖渾然一體的瞿塘、巫、和西陵三峽,從四川奉節(jié)到湖北宜昌綿延約200公里(124英里),處于中國的腹地。長江是亞洲最長的河流同時也是世界上第三長河,從青藏高原的青海到上海附近的東海,全長6,211公里(3,860英里)。這條河的流域是巨大的,跨越1722、155 平方公里(1070、147平方英里)與近4億居民。 1992年4月3日,中國全國人民代表大會批準(zhǔn)在三峽建設(shè)世界上最大和最具爭議的水力發(fā)電設(shè)施。在2003年6月1日開始填充水庫,施工預(yù)計

32、將于2006年5月完成,到2009年將達(dá)到全部發(fā)電。計劃發(fā)電能力有26個發(fā)電機(jī)組,每一個都有700百萬瓦, 從2008年總發(fā)電量的18,200千兆瓦中機(jī)組應(yīng)該生產(chǎn)平均每年84.7B千瓦時(千瓦時左右)。三峽將超過位于巴西/巴拉圭邊境巴拉河上的14,000百萬瓦的伊泰普大壩。政府最新統(tǒng)計數(shù)據(jù)已經(jīng)定它為價格高達(dá)250億美元的項(xiàng)目,盡管其他預(yù)算估計比實(shí)際成本高得多。 這個水庫是630公里長,平均1.3公里寬,同時大壩墻高和深幾乎一樣是185米、穿越山谷延伸2.3公里。自從開始工作以來大約2700萬立方米混凝土已經(jīng)進(jìn)入了結(jié)構(gòu),是科羅拉多河上的胡佛水壩8倍多,伊泰普大壩一倍多的混凝土。三峽工程設(shè)計存儲

33、超過5萬億加侖的水,并且能夠承受的地震的震級為里氏7.0級。 在長江支流上主要分布大約有其他5萬多大壩,那些都是建在過去50年用來創(chuàng)造淡水水庫的。淡水儲存容量的急劇增長,從1950年0.06立方公里到2002年的180立方公里。當(dāng)三峽大壩后的水庫滿了,它合計將增加到40立方公里。 受益于三峽工程的觀點(diǎn) 對于中國領(lǐng)導(dǎo)人來說,三峽大壩將提供了國家未來經(jīng)濟(jì)繁榮的基礎(chǔ),。能量也將幫助滿足中國快速增長的能源需求。同樣重要的是,正在研究開發(fā)用來從工程到國家其余部分運(yùn)輸電力的輸電線路,將有助于創(chuàng)造一個以三峽為心臟的國家高壓輸電線網(wǎng)。 乘客和貨物的運(yùn)輸將會大大增強(qiáng)。三峽將會允許10,000噸級

34、貨輪進(jìn)入其內(nèi)部,目前限制進(jìn)入船在1500噸。能夠駕駛船舶將從上海到重慶,從海上算起大約2000公里。它可能成為一個更重要的交通動脈如果足夠的設(shè)備都是在河上與主要的鐵路和公路的十字路口來整合貨物運(yùn)輸。政府和有關(guān)涉及三峽大壩開發(fā)的公司的也渴望到促進(jìn)這一項(xiàng)目,發(fā)展它作為一個旅游勝地。游船現(xiàn)在提供旅行在水庫為了使國內(nèi)外游客欣賞被稱為崇高三峽投影靜湖”。 大壩也會有重大的防洪效益。歷史上,長江中下游地區(qū)的人們都從洪水在人類的生命和財產(chǎn)安全遭受了巨大的損失。例如,1931年長江大洪水造成了超過300萬人死于洪水和饑荒。 政府也指出,三峽大壩84.7B千瓦時每年的發(fā)電潛能等效于燃燒的50萬噸煤或25萬噸

35、原油的能量。因此,改用清潔的水電會每年從大氣中減少1億噸二氧化碳,2萬多噸的二氧化硫,10萬噸一氧化碳、37萬噸氮氧化物、150,000噸的微粒。 社會和環(huán)境問題 三峽工程的反對者認(rèn)為,項(xiàng)目的成本可能超過其收益, 政府部門涉嫌被夸大了后者。三峽工程對黨來說已經(jīng)變成了一種國家統(tǒng)一和強(qiáng)度的象征。結(jié)果批評家指責(zé)說,許多圍繞項(xiàng)目的爭論都是一些論戰(zhàn)掩蓋或忽略。在一段在工程師的演講中,當(dāng)時李鵬總理本人也是一位高級工程師說,工程的規(guī)模對于世界來說是中國新生力量的證明?!伴L江筑壩有極為重要的政治和經(jīng)濟(jì)意義……它證明整個世界中國人民的能力,他們能建造世界最高的一流的水電工程”。大壩施工中因此也一樣成

36、為中華民族以及中國領(lǐng)導(dǎo)階層的慶典, ,因?yàn)樗且粋€巨大的能力和工程的壯舉。 對于項(xiàng)目外國的獲知已經(jīng)遭受了北京主要建議者李鵬的聲譽(yù),一些歷史學(xué)家持有他應(yīng)當(dāng)負(fù)責(zé)在1989年天安門廣場屠殺的觀點(diǎn),他支持建壩來保證我國的能源供應(yīng)在內(nèi)部政治鎮(zhèn)壓與國際孤立之中。1992年李鵬是審批三峽工程的驅(qū)動力,是通過全國人民代表大會的,盡管三分之一沒有投票或者棄權(quán)的代表——在會議上一些很罕見的異議。 移民是一個主要爭論來源。超過120萬人口將在長江三峽被淹沒之前必須被重新安置。整個村莊和部分主要城市已經(jīng)遷移新址。評論家宣稱,這些強(qiáng)制撤離該地區(qū)的人們特別是失去肥沃土地的人們還沒有被充分補(bǔ)償。但政府堅持認(rèn)為其薪酬福利

37、補(bǔ)償計劃的規(guī)模來論證其承擔(dān)起社會責(zé)任,幫助受災(zāi)者改善他們的生活水平。 1000多個考古的站點(diǎn)將被水淹沒在水庫之下。祖先的墓葬地、悠久的廟宇,動物的化石,和那些注明早在舊石器時代的古跡如果它們不是在水位上升之前出土的和被安置的水域的話會丟失于公共存取和學(xué)術(shù)追求。政府已對它采取措施,將會減少這些損失。 這其中也要考慮到該項(xiàng)目將對生物多樣性涉及的影響。長江白冀豚,古河鱘和江豚都依靠長江來維持他們的生存。在鄱陽湖西伯利亞鶴的種類也會被大壩影響。 水庫的沉降問題也是一項(xiàng)嚴(yán)峻的挑戰(zhàn)。長江的流動攜帶世界上河流第五大輸沙量,相當(dāng)于世界海洋約4%的以河流傳播的泥沙量。泥沙在水壩后和整個儲層的累積會影響整體

38、水庫的存儲容量。存儲容量的損失會直接導(dǎo)致這個降低工程的防洪能力。高速率的泥沙存儲已經(jīng)影響了引水渠道,并且不久大壩運(yùn)行比預(yù)料的更嚴(yán)重。 長江分出一個延伸到中國東海655公里廣闊的河口,并形成世界上最大的大陸架之一。超過一半的長江一年輸沙量沉降在河口。河口的好壞取決于傳遞的沉積物,因?yàn)樵诤恿鳚竦厣L速度、潮間帶沉積物供給之間存在顯著關(guān)系。然而,由于三峽大壩工程及其他的大壩,在所有水庫中沉積物積累率都從1950年接近零提高到2003年每年超過850 * 106噸。這是導(dǎo)致濕地生境侵蝕的原因,濕地能為魚類提供照顧、為候鳥提供休息區(qū)域,更被認(rèn)為是世界上最重要的濕地生態(tài)系統(tǒng)。正如在尼羅河上埃及阿斯旺大壩建成后相類似的效應(yīng)。

展開閱讀全文
溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

相關(guān)資源

更多
正為您匹配相似的精品文檔
關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號:ICP2024067431-1 川公網(wǎng)安備51140202000466號


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺,本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請立即通知裝配圖網(wǎng),我們立即給予刪除!