模具外文翻譯外文文獻英文文獻注塑模
《模具外文翻譯外文文獻英文文獻注塑?!酚蓵T分享,可在線閱讀,更多相關《模具外文翻譯外文文獻英文文獻注塑模(17頁珍藏版)》請在裝配圖網(wǎng)上搜索。
1、The Injection Molding 1、The injection molding Injection molding is principally used for the production of the thermoplastic parts,although some progress has been made in developing a method for injection molding some thermosetting materials.The problem of injection a method plastic into a mold c
2、avity from a reservoir of melted material has been extremely difficult to solve for thermosetting plastic which cure and harden under such conditions within a few minutes.The principle of injection molding is quite similar to that of die-casting.The process consists of feeding a plastic compound in
3、powered or granular form from a hopper through metering and melting stages and then injecting it into a mold.After a brief cooling period,the mold is opened and the solidified part ejected.Injection-molding machine operation.The advantage of injection molding are:(?。゛ high molding speed adapter for
4、mass production is possible;(ⅱ)there is a wide choice of thermoplastic materials providing a variety of useful properties;(ⅲ)it is possible to mold threads,undercuts,side holes,and large thin section. 2、The injection-molding machine Several methods are used to force or inject the melted plastic in
5、to the mold.The most commonly used system in the larger machines is the in-line reciprocating screw,as shown in Figure 2-1.The screw acts as a combination injection and plasticizing unit.As the plastic is fed to the rotating screw,it passes through three zones as shown:feed,compression,and metering.
6、After the feed zone,the screw-flight depth is gradually reduced,force the plastic to compress.The work is converted to heat by conduction from the barrel surface.As the chamber in front of the screw becomes filled,it forces the screw back,tripping a limit switch that activates a hydraulic cylinder t
7、hat forces the screw forward and injects the fluid plastic into the closed mold.An antiflowback valve presents plastic under pressure from escaping back into the screw flight. The clamping force that a machine is capable of exerting is part of the size designation and is measured in tons.A rule-of-
8、thumb can be used to determine the tonnage required for a particular job.It is based on two tons of clamp force per square inch of projected area.If the flow pattern is difficult and the parts are thin,this may have to go to three or four tons. Many reciprocating-screw machines are capable of handi
9、ng thermosetting plastic materials.Previously these materials were handled by compression or transfer molding.Thermosetting materials cure or polymerize in the mold and are ejected hot in the range of 375C~410C.Thermosetting parts must be allowed to cool in the mold in order or remove them without d
10、istortion. Thus thermosetting cycles can be faster.Of course the mold must be heated rather than chilled,as with thermoplastics. 3、Basic Underfeed Mould A simple mould of this type is shown in Figure3-1,and the description of the design and the opening sequence follows.The mould consists of three
11、basic parts,namely:the moving half,the floating cavity plate and the feed plate respectively. The moving half consists of The moving mould plate assembly,support block,backing plate,ejector assembly and the pin ejection system.Thus the moving half in this design is identical with the moving half of
12、 basic moulds. The floating cavity plate,which may be of the integer or insert-bolster design,is located on substantial guide pillars(not shown)fitted in the feed plate.These guide pillars must be of sufficient length to support the floating cavity plate over its full movement and still project to
13、perform the function of alignment between the cavity and core when the mould is being closed.Guide bushes are fitted into the moving mould plate and the floating cavity plate respectively. The maximum movement of the floating cavity plate is controlled by stop or similar device.The moving mould pla
14、te is suitably bored to provide a clearance for the stop bolt assembly.The stop bolts must be long enough to provide sufficient space between the feed plate and the floating cavity plate for easy removal of the feed system.The minimum space provide for should be 65mm just sufficient for an operator
15、to remove the feed system by hand if necessary. The desire operating sequence is for the first daylight to occur between the floating cavity plate.This ensures the sprue is pulled from the sprue bush immediately the mould is opened.To achieve this sequence,springs may be incorporated between the fe
16、ed plate and the floating cavity plate.The springs should be strong enough to give an initial impetus to the floating cavity plate to ensure it moves away with the moving half.It is normal practice to mount the springs on the guide pillars(Figure3-2)and accommodate them in suitable pocket in the cav
17、ity plate. The major part of the feed system(runner and sprue)is accommodated in the feed plate to facilitate automatic operation,the runner should be of a trapezoidal form so that once it is pulled from the feed plate is can easily be extracted.Note that if a round runner is used,half the runner i
18、s formed in the floating cavity plate,where it would remain,and be prevented from falling or being wiped clear when the mould is opened. Now that we have considered the mould assembly in the some detail,we look at the cycle of operation for this type of mould. The impressions are filled via the fe
19、ed system(Figure3-1(a))and after a suitable dwell period,the machine platens commence to open.A force is immediately exerted by the compression springs,which cause the floating cavity plate to move away with the moving half as previously discussed.The sprue is pulled from the sprue bush by the sprue
20、 puller.After the floating cavity plate has moved a predetermined distance,it is arrested by the stop bolts.The moving half continues to move back and the moldings,having shrunk on to the cores,are withdrawn from the cavities.The pin gate breaks at its junction with the runner(Figure3-1(b)). The sp
21、rue puller,being attached to the moving half,is pulled through the floating cavity plate and thereby release the feed system which is then free to fall between the floating cavity plate and the feed plate.The moving half continues to move back until the ejector system is operated and the moldings ar
22、e ejected(Figure3-1(c)).When the mould is closed,the respective plates are returned to their molding position and the cycle is repeated. 4、Feed System It is necessary to provide a flow-way in the injection mould to connect the nozzle(of the injection machine)to each impression.This flow-way is ter
23、med the feed system.Normally the feed system comprises a sprue,runner and gate.These terms apply equally to the flow-way itself,and to the molded material which is remove from the flow-way itself in the process of extracted the molding. A typical feed system for a four-impression,two plate-type mou
24、ld is shown in Figure4-1.It is seen that the material passes through the sprue,main runner,branch runner and gate before entering the impression.As the temperature of molten plastic is lowered which going through the sprue and runner,the viscosity will rise;however,the viscosity is lowered by shear
25、heat generated when going through the gate to fill the cavity.It is desirable to keep the distance that the material has to travel down to a minimum to reduce pressure and heat losses.It is for this reason that careful consideration must be given to the impression layout gate’s design. 4.1.Sprue A
26、 sprue is a channel through which to transfer molten plastic injected from the nozzle of the injector into the mold.It is a part of sprue bush,which is a separate part from the mold. 4.2.Runner A runner is a channel that guides molten plastic into the cavity of a mold. 4.3.Gate A gate is an entr
27、ance through which molten plastic enters the cavity.The gate has the following function:restricts the flow and the direction of molten plastic;simplifies cutting of a runner and moldings to simplify finishing of parts;quickly cools and solidifies to avoid backflow after molten plastic has filled up
28、in the cavity. 4.4.Cold slug well The purpose of the cold slug well,shown opposite the sprue,is theoretically to receive the material that has chilled at the front of nozzle during the cooling and ejection phase.Perhaps of greater importance is the fact that it provides position means whereby the
29、sprue bush for ejection purposes. The sprue,the runner and the gate will be discarded after a part is complete.However,the runner and the gate are important items that affect the quality or the cost of parts. 5、Ejection A molding is formed in mould by injecting a plastic melt,under pressure,into
30、 an impression via a feed system.It must therefore be removed manually.Furthermore,all thermoplastic materials contract as they solidify,which means that the molding will shrink on to the core which forms it.This shrinkage makes the molding difficult to remove. Facilities are provided on the inject
31、ion machine for automatic actuation of an ejector system,and this is situated behind the moving platen.Because of this,the mould’s ejector system will be most effectively operated if placed in the moving half of the mould,i.e. the half attached to the moving platen.We have stated previously that we
32、need to eject the molding from the core and it therefore follows that the core,too,will most satisfactorily be located in the moving half. The ejector system in a mould will be discussed under three headings,namely:(?。﹖he ejector grid;(ⅱ)the ejector plate assembly; and(ⅲ)the method of ejection. 5.
33、1、Ejector grid The ejector grid(Figure5-1) is that part of the mould which supports the mould plate and provides a space into which the ejector plate assembly can be fitted and operated.The grid normally consists of a back plate on to which is mounted a number of conveniently shaped “support blocks
34、”. The ejector plate assembly is that part of the mould to which the ejector element is attached.The assembly is contained in a pocket,formed by the ejector grid,directly behind the mould plate.The assembly(Figure5-2)consists of an ejector plate,a retaining plate and an ejector rod.One end of t
35、his latter member is threaded and it is screwed into the ejector plate.In this particular design the ejector rod function not only as an actuating member but also as a method of guiding the assembly.Note that the parallel portion of the ejector rod passes through an ejector rod bush fitted in the ba
36、ck plate of the mould. 5.2、Ejection techniques When a molding cools,it contracts by an amount depending on the material being processed.For a molding which has no internal form,for example,a solid rectangular block,the molding will shrink away from the cavity walls,thereby permitting a simple ejec
37、tion technique to be adopted.However,when the molding has internal form,the molding,as it cools,will shrink onto the core and some positive type of ejection is necessary. The designer has several ejection techniques from which to choose,but in general,the choice will be restricted depending upon th
38、e shape of the molding.The basic ejection techniques are as follows:(?。﹑in ejection(ⅱ)sleeve ejection(ⅲ)stripper plate ejection and(Ⅳ)air ejection. Figure 2-1a Figure 2-1b
39、 Figure 3-1 Figure 3-2 Figure 4-1a Figure 4-1b Figure 5-1 Figure 5-2
40、 注塑模 1、注塑模 盡管成型某些熱固性材料的方法取得了一定的進步,但注塑模主要(還是)用來生產(chǎn)熱塑性塑件。(這主要是因為)熱固性塑料熔體在很短的時間內(nèi)就固化和硬化,在從料斗想模具型腔注入熱固性塑料熔體的過程中,也會出現(xiàn)這種情況,這個問題一直非常難解決,注塑成型原理和鑄造十分相似。注塑成型的工藝包括:首先把料斗中的粉狀或粒狀的塑料混合物依次輸送發(fā)哦計量區(qū)和溶化區(qū),然后再注射到模具的型腔中,經(jīng)過短時冷卻后,開模,推出成型塑件,注塑機分為手動、半自動及全自動操作。注塑模具有以下優(yōu)點:(ⅰ)較
41、高的成型速度使大批量生產(chǎn)成為可能;(ⅱ)為成型具有不同使用性能的熱塑性材料提供了較寬的選擇;(ⅲ)可以成型帶有螺紋的塑件、側向凹陷的塑件、帶有側孔的塑件以及較大的薄壁件。 2、注塑機 熔融塑料進入模具中通常有幾種方式。在大型注塑機上常帶采用螺桿式的注入方式,如圖2-1所示。螺桿同時具有注射和塑化的功能。樹脂原料進入旋轉的螺桿時,要經(jīng)過圖示的三個區(qū)域:喂入?yún)^(qū)、壓實區(qū)和計量區(qū)。經(jīng)過喂入?yún)^(qū)后,為壓實樹脂原料,螺桿螺旋部分的深度逐漸降低,同時傳遞樹脂原料間因剪切作用而產(chǎn)生的熱量,使原料呈半流動狀態(tài)。在計量區(qū),螺缸表面的加熱裝置對熔體進一步加熱。當熔體充滿螺桿前部區(qū)域時,螺桿在熔體壓力的作用下后退,
42、觸動限位開關使液壓缸工作,在液壓力的作用下推動螺桿向前運動,將熔融塑料注射到閉合的模具型腔中。防倒流閥能夠阻止受壓熔體倒流進螺桿的螺旋區(qū)。 注塑機的鎖模系統(tǒng)做提供的鎖模力由(塑件在分型面的投影)尺寸決定,鎖模力以噸位單位。通??拷?jīng)驗來決定塑件所需要的鎖模力總噸數(shù),一般在塑件投影面積上每平方英寸需要作用兩噸鎖模力。如果熔體流動困難或塑件較薄,鎖模力應提高到三到四噸。 許多往復螺桿式注塑機能生產(chǎn)熱固性塑料。以前,熱固性塑料由擠出模具或傳遞模具生產(chǎn)。熱固性塑料熔體在模具內(nèi)固化或發(fā)生聚合反應,并在溫度357℃~410℃范圍內(nèi)推出。熱塑性塑料熔體必須在模具內(nèi)冷卻成型,以保證推出時不發(fā)生變形,這種熱固
43、性循環(huán)速度很快。當然,生產(chǎn)熱塑性塑料時,模具必須被加熱,而不是冷卻。 3、模具基本結構 這種簡單的模具結構如圖3-1所示,模具設計和開模順序將在以下的篇幅中論述。模具由三個基本部分組成,分別是動模部分、浮動型腔板和定模板。 動模部分包括動模板組件、支撐塊、支撐板,推出機構和頂桿推出系統(tǒng)。這樣設計的動模部分與最基本的模具結構中的動模部分相同。 浮動型腔板通過導柱(圖中沒有示出)固定在定模板上,設計形式可以是整體式,也可以是鑲拼式。導柱必須有足夠的長度,(以便磨具工作時)支撐浮動型腔板完成開合動作,并在模具合模時完成對型腔和型芯的找正作用。導套分別安裝在動模板和浮動型腔板上。 浮動型腔板
44、的最大運動距離由限位釘或類似裝置控制。在動模板的適當位置鉆孔,以便安裝限位釘。限位釘必須有足夠的長度為定模板和浮動型腔板之間提供足夠的空間,從而使?jié)沧⑾到y(tǒng)的凝料順利脫落。如果必須使用手動方式取出凝料,開模時取出凝料所需的最小距離應為65mm。 模具的開模順序是:浮動型腔板和定模板先分開。確保模具打開時澆注系統(tǒng)凝料立即從澆口套脫出。為實現(xiàn)這樣的順序,定模板和浮動型腔板之間裝有彈簧。彈簧的彈力必須足夠大,確保在初始推力的作用下浮動型腔板跟隨動模部分一起運動。彈簧套在導柱上,一同裝在浮動型腔板上相應的彈簧座處(見圖5-2),這種形式在彈簧裝配中十分常見。 澆注系統(tǒng)的主要部分(分流道和主流道)開設
45、在定模板上,為便于自動操作,分流道應采用梯形截面,以便于脫出澆注系統(tǒng)凝料。注意,如果采用圓形分流道,分流道的一半開設在浮動型腔板上,開模時,分流道可能留在浮動型腔板,將阻礙凝料的脫落或去除。 我們已經(jīng)詳細討論模具裝配,再看這類模具的生產(chǎn)循環(huán)過程。 熔體經(jīng)過澆注系統(tǒng)充滿型腔后(見圖3-1(a)),經(jīng)過適當?shù)谋哼^程,注塑機帶動模具開模。壓縮彈簧的彈力立即釋放出來,推動浮動型腔板和動模部分一起移動,如同前面論述的一樣。主流道凝料被拉料桿從澆口套中拉出。浮動型腔板移動預定距離后,被限位釘限位。動模部分繼續(xù)后移,塑件由于收縮作用包緊在型芯上從型腔中脫出(跟隨動模一同移動)。點澆口在結合處拉斷,與分
46、流道脫離(見圖3-1(b))。 安裝在動模部分的拉料桿脫離浮動型腔板,澆注系統(tǒng)凝料由此脫下,然后在浮動型腔板和定模板之間自由落下。動模部分繼續(xù)后退,直到推出機構開始運動,推出塑件(見圖3-1(c))。和模時,模具的各模板回到成型位置,重復下一個注塑循環(huán)。 4、澆注系統(tǒng) 在注塑模中,連接(注塑機)噴嘴和各個型腔的流動通道是十分必要的,這種進料通道稱為澆注系統(tǒng)。通常,澆注系統(tǒng)由主流道、分流道和澆口組成。這些術語應用在相應的進料通道本身,以及取出塑料時從進料通道中一同取出的澆注系統(tǒng)凝料。 圖4-1所示為典型的兩版式四腔澆注系統(tǒng)。從圖中可以看出原料通過主流道、第一分流道、第二分流道和澆口注入道
47、型腔中。熔融塑料通過主流道和分流道時溫度降低而使熔體黏度升高,然而,熔體通過澆口填充型腔時,由于剪切作用產(chǎn)生的熱量又使黏度降低。澆注系統(tǒng)要保持適當?shù)拈L度,使熔體的壓力減少和熱量損失降到最低。因此,設計時必須充分考慮型腔布局和澆口形式。 4.1、主流道 主流道是將熔融塑料從注塑機噴嘴傳遞到模具型腔的通道。主流道是澆口套的一部分,澆口套是獨立于模具的單獨零件。 4.2、分流道 分流道是引導熔體塑料進入模具型腔的通道。 4.3、澆口 澆口是熔融塑料進入型腔的入口。澆口有以下作用:約束熔融塑料流動,應道熔融塑料的流動方向;使分流道和塑件末端易于分離;快速冷卻固化,防止熔融塑料充滿型腔后倒流
48、。 4.4、冷料井 冷料井正對著主流道。理論上,冷料井的作用是用來儲存在(塑件)冷卻和推出過程中注塑機噴嘴處所形成的熔體前鋒冷料。也許冷料井更重要的作用是(開模時)幫助澆道凝料推出澆口套。 塑料成型后,主流道、分流道和澆口部分凝料將被廢棄。但是,分流道和澆口對塑件質量和成本有重要影響。 5、推出機構 塑料熔體在壓力作用下進過澆注系統(tǒng)進入模具型腔形成塑件,因此(塑件成型后)必須手動取出。此外,所有熱塑性熔體凝固時都會收縮,這意味這著塑件將包緊在型芯上。收縮作用使塑件脫模(存在)困難。 注塑機為推出系統(tǒng)提高了自動推出力,其推出動力裝置安裝在注塑機移動板的后面。因此,模具的推出系統(tǒng)安裝在
49、動模部分將獲得最大效率,例如,這部分(可以)安裝在移動板上。我們在前面論述了 (開模時)需要從型芯上推下塑件,因此,塑件必須跟隨型芯(一同移動),推出系統(tǒng)裝在動模部分最為合適。 模具的推出系統(tǒng)將在以下三個標題中討論,即:(ⅰ)推出支架;(ⅱ)推板裝配機構;(ⅲ)推出方式。 5.1、推出支架 推出支架(見圖5-1)是模具的一部分,用來支撐模板,為推板的裝配和運動提供空間。推出支架通常由定模座板和幾塊支撐塊組成,支撐塊安裝在動模座板上,且便于加工成型。 推板裝配機構也是模具的一部分,用來安裝推出零件。推板裝配機構安裝在推板支撐架內(nèi),直接裝在模板后面。裝配機構(見圖5-2)由推板、推板固定板
50、和注塑機頂出桿組成。注塑機頂出桿一端帶有螺紋,通過螺紋緊固在推板上。在這種結構中,頂出桿的作用不僅是推出零件,而且為推板裝配機構起導向作用。注意,頂出桿上直接相等的部分通過頂出桿套筒,套筒安裝在模具座板上。 5.2、推出方式 塑件冷卻后,其收縮狀態(tài)決定于塑料熔體的成型過程。對于內(nèi)部不帶有其他形狀的塑件,例如,實芯矩形件,塑件的收縮作用使其脫離型腔壁,因此,可以采用簡單的脫模方式(推出塑件)。然而,若塑件具有內(nèi)部形狀,冷卻收縮時塑件將包緊在型芯上,因此,有必要采用一些適當?shù)姆椒ㄍ瞥鏊芗? 設計推出機構時有幾種方式可供選擇,但是,總的來說,選擇哪種推出方式取決于塑件的形狀。基本的推出方式有以下幾種:(?。┩茥U脫模;(ⅱ)推管脫模;(ⅲ)推件板脫模;(ⅳ)氣動脫模。
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。