購(gòu)買設(shè)計(jì)請(qǐng)充值后下載,,資源目錄下的文件所見(jiàn)即所得,都可以點(diǎn)開預(yù)覽,,資料完整,充值下載就能得到。。?!咀ⅰ浚篸wg后綴為CAD圖,doc,docx為WORD文檔,有不明白之處,可咨詢Q:1304139763
Optimal Mechanism Design of In pipe Cleaning Robot Chang Doo Jung Won Jee Chung Jin Su Ahn and Myung Sik Kim Gi Soo Shin and Soon Jea Kwon Dept of Mechanical Design and Manufacturing Engineering Deputy General Manager Robot Valley Co Ltd Changwon National University Dept of Mechanical Engineering Pu Kyung National University 9 Sarim dong Changwon Gyeongnam Republic of Korea 125 1 Shinchon ding Changwon Gyeongnam Republic of Korea Bukyong National Univ Yongdang dong Nam gu Busan Republic of Korea raita110 wjchung changwon ac kr lycosjinsu and thtkajgo shings75 and sjkwon pknu ac kr Abstract Recently interests on cleaning robots workable in pipes termed as in pipe cleaning robot are increasing because Garbage Automatic Collection Facilities i e GACF are widely being installed in Seoul metropolitan area of Korea So far research on in pipe robot has been focused on inspection rather than cleaning In GACF when garbage is moving we have to remove the impurities which are stuck to the inner face of the pipe diameter 300mm or 400mm Thus in this paper by using TRIZ Inventive Theory of Problem Solving in Russian abbreviation we will propose an in pipe cleaning robot of GACF with the 6 link sliding mechanism which can be adjusted to fit into the inner face of pipe using pneumatic pressure not spring The proposed in pipe cleaning robot for GACF can have forward backward movement itself as well as rotation of brush in cleaning The robot body should have the limited size suitable for the smaller pipe with diameter of 300mm In addition for the pipe with diameter of 400mm the links of robot should stretch to fit into the diameter of the pipe by using the sliding mechanism Based on the conceptual design using TRIZ we will set up the initial design of the robot in collaboration with a field engineer of Robot Valley Inc in Korea For the optimal design of in pipe cleaning robot the maximum impulsive force of collision between the robot and the inner face of pipe is simulated by using RecurDyn when the link of sliding mechanism is stretched to fit into the 400mm diameter of the pipe The stresses exerted on the 6 links of sliding mechanism by the maximum impulsive force will be simulated by using ANSYS Workbench based on the Design Of Experiment in short DOE Finally the optimal dimensions including thicknesses of 4 links will be decided in order to have the best safety factor as 2 in this paper as well as having the minimum mass of 4 links It will be verified that the optimal design of 4 links has the best safety factor close to 2 as well as having the minimum mass of 4 links compared with the initial design performed by the expert of Robot Valley Inc In addition the prototype of in pipe cleaning robot will be stated with further research Index Terms In pipe Cleaning Robot 6 link Sliding Mechanism TRIZ Optimal Design RecurDyn Design Of Experiment DOE ANSYS Workbench I INTRODUCTION Recently interests on cleaning robots workable in pipes we will call this category of robots in pipe cleaning robot hereinafter are increasing because Garbage Automatic Collection Facilities i e GACF are widely being installed in Seoul metropolitan area of Korea Even though Korean GACF is in the initial stage according to survey 1 so far residents satisfaction level was reported to be high by solving environmental problems including the beauty of apartments resulted from existing manual pickup way However the GACF still has the problems such as expensive facility installation charges high operating expenses decline of both pickup rate of food waste and recycling rate etc This means that the technical skills for improving stable operation are needed for GACF So far the way of Korean garbage pickup is as follows when we put garbage in plastic bags and leave at a certain place a pickup vehicle goes around that area and picks up the garbage Usually the garbage is exposed on a road and often dogs cats or rats etc can damage the garbage bag As a result the beauty of city can be made marred especially in summer Moreover the garbage bags can result in stench of flies or harmful insects Therefore this garbage disposal system can be concluded to be unsanitary In comparison with this inconvenient and unsanitary way of current Korean garbage disposal and pickup system the GACF has a garbage only slot installed at regular intervals In GACF pipes are constructed underground into which make users be able to throw garbage bags After the garbage is stored temporarily at the bottom of the slot it is picked up at a storage area connected to the pipes Thus GACF does not need any manpower picking up garbage and further is an environment friendly system that the garbage is not exposed outside In contrast to the existing pickup way by manpower and vehicles GACF has a central collected facility with about 60 70km h high speed running air in a constructed pipe underground The GACF can put the garbage into a trash burner in accordance with the type of garbage inflammable or not inflammable The processed garbage can be carried to a 1327978 1 4244 8115 6 11 26 00 2011 IEEE Proceedings of the 2011 IEEE International Conference on Mechatronics and Automation August 7 10 Beijing China final disposal site by a container vehicle Fig 1 shows the key map of GACF Fig 1 Key map of GACF As mentioned above GACF can collect household garbage fast and clean Moreover GACF can carry household garbage to the final disposal site i e trash burner In specific when residents throw away household waste into an input slot of GACF the garbage is transported through a pipe connected with a collected site At the collected site GACF operates an air blower connected with the pipe and inhales air from an air intake port as shown in Fig 1 At this moment according to air flow GACF collects household garbage In order to stably maintain GACF for a long period in pipe cleaning is important In the near future an in pipe cleaning robot with autonomous movement needs to be developed for making the pipe clean The usage of in pipe cleaning robot can make the aging of pipe delayed so that pipe replacement costs can be reduced So far research on in pipe robot has been focused on inspection rather than cleaning For example Roh et al 2 has developed a differentially driven in pipe inspection robot for underground gas pipeline Besides Choi et al 3 has developed the in pipe inspection cleaning robot which can be stuck on the inner face of pipe by using wheels with springs as shown in Fig 2 This robot has a severe drawback that the robot could be separated from the inner face of pipe when one wheel would be not effective at branching point of pipe Fig 2 in pipe inspection cleaning robot Choi et al 3 In GACF when garbage is moving we have to remove the impurities which are stuck to the inner face of the pipe diameter 300mm or 400mm Thus in this paper we will develop an in pipe cleaning robot of GACF with the sliding mechanism which can be adjusted to fit into the inner face of pipe using pneumatic pressure not spring The proposed in pipe cleaning robot for GACF can have forward backward movement itself as well as rotation of brush in cleaning The robot body should have the limited size suitable for the smaller pipe with diameter of 300mm In addition for the pipe with diameter of 400mm the links of robot should stretch to fit into the diameter of the pipe by using the sliding mechanism The robot has a camera at its front and a spinning brush which can perform both cleaning and inspection simultaneously Also it can raise cleaning efficiency by making two brushes spinning inversely each other This paper is organized as follows Section II explains the conceptual design of the proposed in pipe cleaning robot by using TRIZ Inventive Theory of Problem Solving in Russian abbreviation 4 Based on this conceptual design we will set up the initial design of the robot in collaboration with the field engineer of Robot Valley Inc in Korea For the optimal design of in pipe cleaning robot in Section III the maximum impulsive force of collision between the robot and the inner face of pipe will be simulated by using RecurDyn when the link of sliding mechanism is stretched to fit into the 400mm diameter of the pipe In Section IV the stresses exerted on the 6 links of sliding mechanism by the maximum impulsive force will be simulated by using ANSYS Workbench based on the Design Of Experiment in short DOE Finally the optimal dimensions including thicknesses of 4 links will be decided in order to have the best safety factor as 2 in this paper as well as having the minimum mass of 4 links Section V will draw conclusions II BASIC DESIGN OF IN PIPE CLEANING ROBOT USING TRIZ The conceptual design of the proposed in pipe cleaning robot is performed by using the 6SC 5 of TRIZ as follows A The 1 st Step of 6SC Problem Statement in Picture Figure 3 shows a simple design of in pipe cleaning robot The problem is that the robot cannot fit into a pipe with 300mm 400mm in diameter because it does not have any changeable mechanism according to two types of pipe 300mm or 400mm in diameter Fig 3 Simple design of in pipe cleaning robot B The 2 nd Step of 6SC System Functional Analysis To cope with the problem suggested above we first perform system functional analysis as shown in Fig 4 based 1328 on the goal that the robot should be designed to fit into two types of pipe 300mm or 400mm in diameter In this figure maintaining the diameter of robot means keeping the status of robot fit into a pipe Fig 4 System functional analysis C The 3 rd step of 6SC Ideal Final Result IFR As IFR we suggest the robot be designed to fit into the smaller diameter i e 300mm of pipe and then fit into the larger diameter i e 400mm in a stretchable form D The 4 th step of 6SC Principle of Contradiction and Separation The following sentence can be expressed in contradiction Two robot bodies should be designed to fit into two types of pipe 300mm or 400mm in diameter respectively And the robots should be designed as one body To find a solution of the contradiction problem we apply the principle of separation in the following sentence Each robot body for two types of pipe is designed separately and then the two robot bodies are put together into one robot body E The 5 th Step of 6SC Elements Interaction Analysis Figure 5 shows the elements interaction analysis In this problem the elements are Body of Robot and Diameter of Pipe This figure suggests that the body of robot is designed to fit into two standardized diameters 300mm and 400mm of pipe as a variable mechanism Fig 5 Elements interaction analysis F The 6 th Step of 6SC Problem Solution and Appraisal The tentative solution of problem can be drawn as follows the diameter of robot needs to be changeable for both two types of standardized pipes 300mm or 400mm As shown in Fig 6 the final problem solution proposed in this paper is 6 link sliding mechanism to fit into a pipe with 300mm 400mm in diameter Especially in this solution pneumatic pressure is used for making the sliding mechanism fit into the inner face of pipe Consequently the robot has three 6 link sliding mechanisms for one slider as shown in Fig 7 As shown in this figure the in pipe cleaning robot has total six 6 link sliding mechanisms i e 3 for the front slider and 3 for the rear slider Fig 6 6 link sliding mechanism Fig 7 Three 6 link sliding mechanisms for one slider The appraisal of this problem solution can be made as follows when one of three 6 link mechanisms falls in a branching point of pipe 6 link sliding mechanism using pneumatic pressure can escape the branching point by maintaining the diameter of robot in other words the status of robot fit into a pipe and can move stably because two of three 6 link mechanisms can be fixed as shown in Fig 8 Fig 8 Appraisal of 6 link sliding mechanism using pneumatic pressure at a branching point III DYNAMIC SIMULATION USING RECURDYN Based on the conceptual design of in pipe cleaning robot explained in Section II the initial design of 6 link sliding mechanism using pneumatic pressure is proposed in Fig 9 in collaboration of Robot Valley Inc in Korea Especially Table 1 shows the lengths and thicknesses for the initial design of links 1 to 4 which have come from the empirical knowhow of design expert at Robot Valley For the optimal design of in pipe cleaning robot the maximum impulsive force of collision between the robot and the inner face of pipe is simulated in this section by using RecurDyn multi body dynamics 1329 simulation program when the link of sliding mechanism is stretched to fit into the 400mm diameter of the pipe Especially the 400mm diameter of pipe is selected rather than the 300mm diameter of pipe because it has been assumed that the former has bigger acceleration and longer displacement than the latter Fig 9 6 link sliding mechanism using pneumatic pressure TABLE 1 INITIAL DESIGN OF LINKS Links 1 2 3 4 Length mm 91 91 37 145 Thickness mm 10 5 5 10 When the 6 link sliding mechanism with the initial dimensions of lengths and thicknesses of Table 1 is stretched to fit into the 400mm diameter of the pipe owing to pneumatic pressure which pushes the sliding link i e link 5 it collides with the inside wall of the pipe At that time the multi body dynamics simulation program i e RecurDyn is used to find the maximum impulsive force of collision between the robot and the inner face of pipe At the first step for this dynamic simulation the 3 dimensional modeling of 6 link sliding mechanism using SolidWorks as shown in Fig 9 is imported into RecurDyn The constraints considered in this simulation using RecurDyn are gravity joint fixed condition contact and spring force condition The gravity is supplied by g 9 81m s 2 in the direction shown in Fig 10 6 joints are set up as Revolute Joints in RecurDyn as shown in Fig 10 The lower part connected to Joint 1 is fixed while the lower part connected to Joint 2 doesn t need constraint so that it can slide Fig 10 Constraints of joint and fixed condition In collision of six 6 link sliding mechanisms of robot with the inner face of pipe only one 6 link sliding mechanism is considered in RecurDyn for convenience 2 wheels of 6 link sliding mechanism is given by solid contact with the inner side of side as shown in Fig 11 Also the solid contact condition is given against collision of the fixed part connected to Joint 1 with the sliding part connected to Joint 2 Fig 11 Contact constraint The sliding movement of 6 link mechanism is actuated by pneumatic pressure But there is no pneumatic pressure constraint in the RecurDyn program In this simulation we have assigned pneumatic pressure to spring force In case of pneumatic pressure the 6 link mechanism slides at the acceleration of 2 m s 2 Through the dynamic simulation of RecurDyn as shown in Fig 12 the spring force condition with spring constant 5 N mm and spring displacement 40 mm makes the 6 link mechanism slide with 1 97m s 2 acceleration Thus pneumatic pressure can be replaced by spring force with constant 5 N mm and displacement 40 mm Fig 12 Spring force condition Figure 13 shows the impulsive force simulated by using RecurDyn when the 6 link sliding mechanism collides with the inner side of pipe diameter 400 mm As shown in this figure the mechanism slides for 1 second from the instant that spring force condition works Then we can see the maximum impulsive force as about 100N 1330 Fig 13 Simulation result of impulsive force using RecurDyn IV OPTIMAL DESIGN OF 6 LINK SLIDING MECHANISM Now we deal with the optimal design of 6 link sliding mechanism for the in pipe cleaning robot in this section First the maximum impulsive force i e 100N obtained by the dynamic simulation using RecurDyn in the previous section is loaded on the point of wheel 1 for the 6 link sliding mechanism as shown in Fig 14 3 D model of ANSYS Workbench We have assumed that wheel 1 collides with the inner side of pipe earlier than wheel 2 in the dynamic simulation because wheel 1 has shorter distance from the 6 link mechanism than wheel 2 Then static analysis using ANSYS Workbench is performed based on DOE that is Design Of Experiment in order to obtain the optimal dimensions of 4 design variables i e thicknesses of 4 links as shown in Fig 15 Fig 14 3 D model of ANSYS Workbench Fig 15 6 link sliding mechanism top view DOE 6 is usually used to extract the maximum information by performing the minimum simulations or experiments for a given design or performance testing problem The DOE can be helpful in figuring out quantitative effect regarding each design or experiment factor or variable in the problem This leads to find the optimal values of design or experiment variables At design of 6 link mechanism the number of design variables control factors in statistical terms is four of four levels as shown in Table 2 Table 2 shows each factor s levels which has come from the design experience of field engineer at Robot Valley Inc For this 6 link mechanism the orthogonal array L 16 of four level four design variables is generated by using DOE specifically MINITAB instead of full 256 4 4 TABLE 2 LEVEL OF DESIGN VARIABLES Level Factor 1 2 3 4 Link1 Thickness mm 5 10 3 8 Link2 Thickness mm 5 10 3 8 Link3 Thickness mm 5 10 3 8 Link4 Thickness mm 5 10 3 8 Based on the orthogonal array L 16 of Table 3 the static analysis for the 6 link sliding mechanism is performed in 16 times using ANSYS Workbench The optimal values of 4 design variables can be selected according to the criterion 1 the safety factor of 6 link sliding mechanism should be as much as 2 the best safety factor is recommended as 2 by field engineers in the design of robots 2 the mass of the mechanism should be minimized The criterion can be specified in a similar manner to a multi objective problem Thus this multi objective criterion is given by equation 1 Here sf 1 and sf 2 indicate scaling factors Moreover w 1 and w 2 are weighting factors The proper values of weight and scale factors are selected according to equation 1 Since the multi objective criterion has to be a linear combination function the value of 0 5 has been assigned to both w 1 and w 2 In the meanwhile the constants of sf 1 and sf 2 are given by 0 5 and 0 5 respectively in order to impose the ceiling value of the maximum value of objective criterion on 1 According to DOE the 16 times of analyses have been carried out Fig 16 shows on of 16 results performed by the static analysis using ANSYS Workbench Consequently the last column of Table 3 shows the optimal corresponding to the minimum value of objective function design variables underlined in red compared to the other 15 set of design variables Thus the optimal thicknesses of link 1 2 3 and 4 are all 5mm s while the initial ones of link 1 2 3 and 4 are 10mm 5mm 5mm 10mm respectively as shown in Table 1 Finally it can be noticed that the optimal design or optimal thicknesses has the value i e 0 09653 of objective function including safety factor 2 7065 and mass 0 145kg much smaller than the case of initial design with the value i e 0 27631 of objective 1331 function including safety factor 3 6751 and case of initial mass 0 241kg as shown in row 17 underlined in blue of Table 3 Especially the material of links is AL 7075 O ss with heat treated specially Therefore we can conclude that y the optimal design of 4 links has the best safety factor close to 2 as well as having the minimum mass of 4 links compared with the initial design performed by the expert of Robot Valley Inc The prototype of in pipe cleaning robot including the 6 link sliding mechanism with these optimal dimensions is shown in Fig 17 This prototype is under cleaning test in collaboration with Robot Valley Inc TABLE 3 ORTHOGONAL ARRAY Fig 16 One result of static analysis using ANSYS Workbench Fig 17 Prototype of in pipe cleaning robot including 6 link sliding mechanism with optimal dimensions V CONCLUSION Recently interests on in pipe cleaning robot a