影音先锋男人资源在线观看,精品国产日韩亚洲一区91,中文字幕日韩国产,2018av男人天堂,青青伊人精品,久久久久久久综合日本亚洲,国产日韩欧美一区二区三区在线

JGJ 123-2000 既有建筑地基基礎(chǔ)加固技術(shù)規(guī)范 英文版

上傳人:r****d 文檔編號(hào):82697992 上傳時(shí)間:2022-04-29 格式:DOC 頁(yè)數(shù):37 大小:234.50KB
收藏 版權(quán)申訴 舉報(bào) 下載
JGJ 123-2000 既有建筑地基基礎(chǔ)加固技術(shù)規(guī)范 英文版_第1頁(yè)
第1頁(yè) / 共37頁(yè)
JGJ 123-2000 既有建筑地基基礎(chǔ)加固技術(shù)規(guī)范 英文版_第2頁(yè)
第2頁(yè) / 共37頁(yè)
JGJ 123-2000 既有建筑地基基礎(chǔ)加固技術(shù)規(guī)范 英文版_第3頁(yè)
第3頁(yè) / 共37頁(yè)

下載文檔到電腦,查找使用更方便

16 積分

下載資源

還剩頁(yè)未讀,繼續(xù)閱讀

資源描述:

《JGJ 123-2000 既有建筑地基基礎(chǔ)加固技術(shù)規(guī)范 英文版》由會(huì)員分享,可在線閱讀,更多相關(guān)《JGJ 123-2000 既有建筑地基基礎(chǔ)加固技術(shù)規(guī)范 英文版(37頁(yè)珍藏版)》請(qǐng)?jiān)谘b配圖網(wǎng)上搜索。

1、本英文版為內(nèi)部資料,僅供參考,以中文版為準(zhǔn)。 The Chinese version of standards has precedence to their English translations which are only for internal reference. 中華人民共和國(guó)行業(yè)標(biāo)準(zhǔn) Industrial Standard of the People’s Republic of China JGJ 123-2000 既有建筑地基根底 加固技術(shù)標(biāo)準(zhǔn) Technical Code for Improve

2、ment of Soil and Foundation of Existing Buildings Beijing, 2000 中華人民共和國(guó)行業(yè)標(biāo)準(zhǔn) Industrial Standard of the People’s Republic of China 既有建筑地基根底 加固技術(shù)標(biāo)準(zhǔn) Technical Code for Improvement of Soil and Foundation of Existing Buildings JGJ 123-2000 Mainly prepar

3、ed by: Research Institute of Construction Science of the People’s Republic of China Approved by: Ministry of Construction of the People’s Republic of China Implementation date: June 1, 2000 Notice on issuing the industrial standard “Technical Code for Improvement of Soil an

4、d foundation of Existing Buildings〞 Jian Biao [2000] No.35 As per the requirement in “Notice on Issuing Compilation and Revision Project Plan for Construction Project Industrial Standards of 1993〞 (Jian Biao 1993 No. 285), “Technical Code for Improvement of Soil and Foundation of Existing Buildi

5、ngs〞 compiled by Research Institute of Construction Science of People’s Republic of China is hereby reviewed and approved as compulsory industrial standard, number as JGJ 123-2000, and should come into force from June 1, 2000. The subject standard will be managed and interpreted by the Research Ins

6、titute of Construction Science of P. R. China which is the technical responsible unit for the Ministry of Construction. The Research Institute of Standard Quotas organized China Construction Publishing House to publish the standard. Ministry of Construction of People’s Republic of China February

7、 12, 2000 Forward As per the requirement of Jian Biao 1993 No. 285 issued by the Ministry of Construction, the code compilation team hereby compiled this code through extensive investigation and research, with many research results home and abroad and a large amount of construc

8、tion practice experiences summarized, and through opinions broadly solicited. The technical contents of this code many consist of general rules, symbols, basic stipulation, verification of soil and foundation, foundation calculation, improvement methods of soil and foundation, remedy and preventi

9、on of soil and foundation incident or accident, improvement through added layers, reinforcement to rectify incline or replacement, and etc. The code is managed and interpreted by the Research Institute of Construction Science of P. R. China which is the technical responsible unit for the Ministry

10、 of Construction. The code is mainly compiled by the Research Institute of Construction Science of P. R. China (Address: 30 East Third North Ring Road, Beijing; Postcode 100013) The code is jointly compiled by Tongji University, Nothern Communication University, Research Institute of Construct

11、ion Science of Fujian province. The code is mainly compiled by following personnel: Zhang Yongjun, Ye Shuqi, Tang Yeqing, and Hou Weisheng. Table of Content 1 General Rules 5 2 Symbols 5 3 Basic stipulation 6 4 Verification of Soil and Foundation 7 5 Foundation Calculation 9 6 Me

12、thods for Improvement of Soil and Foundation 11 7 Remedy and Prevention of Soil and Foundation Incident 27 8 Modification to Add Stories 32 1 General Rules In order to execute the technical and economical policy of the country during the design and construction of the improvement of soi

13、l and foundation, the code is compiled so that “advanced technology, reasonable economy, safety and adequacy, ensured quality and protected environment〞 can be achieved. This code is applicable to design and construction of any improvement to soil and foundation caused by inadequate soil invest

14、igation, design, construction, or operations, by increased load, incline, displacement, reconstruction or protection of ancient buildings, or by nearby new buildings, excavation of deep foundation pits, new underground services, or natural disaster. The design and construction of improvement of

15、 soil and foundation of existing buildings, besides meeting the requirements of this code, should meet the requirement of relevant national compulsory standards which is in force. 2 Symbols A – Bottom area of foundation d – Pile diameter d’ – Diameter of lime pile after expansion Ep – Co

16、mpression modulus of pile body Es – Compression modulus of soil between piles Esp – Compression modulus of compound soil layer F – Design value of the vertical force on the top surface of foundation from upper structure after reinforcement of foundation or load increased. f – Design value of fou

17、ndation bearing capacity fs,k – Standard value of bearing capacity of soil between piles after improvement fp,k – Standard value of bearing capacity of pile unit section fsp,k – Standard value of bearing capacity of compound foundation G – Design value of foundation weight and weight of soil on

18、top of foundation l1 – Line distance of piles l2 – Row distance of piles M – Design value of moment applied to the bottom of foundation after improvement or increased load m – Replacement ratio of area Na – Design value of bearing load for uplifting point N – Number of uplifting points p – De

19、sign value of average pressure on the bottom of foundation after improvement or increased load pmax – Design value of maximum pressure along the side of the bottom of foundation after improvement or increased load pmin – Design value of minimum pressure along the side of the bottom of foundation a

20、fter improvement or increased load Q – Design value of total load for building q – Lime volume for each meter of lime pile s – Final settlement of foundation s0 – Settlement achieved before improvement or increased load s1 – Settlement achieved after improvement or increased load s2 – Settleme

21、nt to be achieved under original building load W – Sectional modulus at the bottom of foundation after improvement or increased load ηc – Expansion factor 3 Basic stipulation Before improvement of soil and foundation of existing buildings, soil and foundation should be examined to enabl

22、e design and construction. The examination of soil and foundation, and design and construction of improvement should be carried out by companies with relevant certifications and by professional personnel with experiences. Design of improvement of soil and foundation of existing buildings should

23、 be carried out according to the following steps: 1 When selecting method for improvement, objective of improvement, joint function of upper structure, foundation and soil should be considered to decide initially whether soil, foundation, stiffness of upper structure or combination of soil and f

24、oundation should be improved. 2 After the initial schemes are selected, they should be compared through expected achievement, difficulty of construction, material availability and delivery conditions, safe constructability, impact to adjacent building or environment, conditions of construction equ

25、ipment, construction period and cost, so that a optimum scheme can be selected. The construction people should understand the objective of improvement, theory, technical requirement and quality standard for the improvement project undertaken. Dedicated personnel are required for quality control

26、 through strict monitoring. Whenever an abnormal condition is observed, meeting should be held with designers and relevant department to analyze the problem and find solutions. A dedicated organization is required to supervise quality during construction. When the construction is complete, qual

27、ity inspection and acceptance should be conducted. Settlement observation is required during construction of improved to soil and foundation. For buildings of importance or of strict restriction of settlement, settlement observation should be continued after the improvement until it becomes sta

28、ble. Adjacent buildings and underground services should be monitored at the same time. 4 Verification of Soil and Foundation 4.1 Verification of Soil The following steps should be observed when examining soil of existing buildings, 1 Collect geotechnical investigation information,

29、 design documents and drawings of foundations for existing buildings and upper structure, construction recorded of concealed parts, and as-built drawings. 2 The following things should be analyzed when studying the original geotechnical investigation information. 1) Distribution and evenness of s

30、ubsoil, weak underlying layer, special soil, gullies, ditches, rivers, tombs, caves, and holes. 2) Physical and mechanical properties of subsoil. 3) Water level and corrosivity of groundwater 4) Liquefaction characteristic of silt or sand, and earthquake characteristic of soft soil 5) Stability

31、of site 3 Investigate the current condition of the building, actual working load, settlement, and settlement stability, differential settlement, distortion, incline and crack etc, and find causes. 4 Investigate adjacent buildings, underground services, and pipeline. 5 Work out inspection metho

32、d to verify the soil based on the objective of improved, together with information collected and analyses of information. The following methods can be adopted for inspection of soil according to improvement requirement and site condition. 1 Drilling, pit exploration, channel exploration, or

33、 earth physical method can be adopted. 2 Indoor physical mechanical property test can be carried out on undisturbed soil. 3 In-situ tests like load test, cone penetration test, standard penetration test, dynamic penetration test, cross-board shear test or side pressure test can be adopted.

34、Inspection of soil of existing buildings should comply the following requirements. 1 According to the importance fo the building and original geotechnical investigation information, supplementary borehole or in-situ test hole should be provided to find out subsoil distribution and soil physical

35、and mechanical properties. Holes should be close to foundation. 2 For important buildings that require adding stories or increase load, it is suitable to take undisturbed soil and carry out indoor physical mechanical property test or load test under the foundation. When evaluating soil of exi

36、sting building, the following requirements should be met. 1 According to the inspection result, together with local experience, a compressive evaluation of the soil should be prepared. 2 Decide whether it is necessary to improve soil and provide recommendations of improvement method based on t

37、he soil condition and upper structure. 4.2 Verification of foundation Inspection of foundation of existing building should be carried out according to the following steps. 1 Collect design and construction documents for foundation, upper structure, and pipeline, and as-built drawings. Und

38、erstand the actual load on different parts of the building. 2 Site proof is required. Exploration channel may be required to verify foundation type, material, dimension, and embedded depth. Examine crack in the foundation, corrosiveness, degree of damage, strength and grade of foundation materials

39、. If the building inclines, then degree of incline and distortion should be investigated as well. For piled foundations, pile depth, bearing layer and pile quality should also be investigated. The following methods can be adopted for the inspection of foundation of existing building. 1 Visual

40、 check of foundation 2 Initial check with hand hammer to find out foundation quality. Find out strength or grade of foundation material using non-destructive method or core-taking method. 3 Check rebar diameter, number of piles, location, and corrosiveness. 4 Observe settlement of pile foundat

41、ion. When evaluating foundation of existing building, the following requirements should be met. 1 Evaluate completeness of the foundation based on cracks, corrosiveness, degree of damage and grade of materials. 2 Calculate bearing capacity and deformation based on the actual load and deform

42、ation characteristics. Decide whether it is necessary to improve, and recommend method of improvement. 5 Foundation Calculation 5.1 Calculation of bearing capacity When the foundation of existing building need to be improved or the load is to be increased, the bearing capacity of soil s

43、hould be calculated in accordance with following requirements. When the axial load works p<=f (5.1.1-1) Where, p – design value of average pressure at the bottom of foundation after improved or increased load. f – Design value of soil bearing capacity, whi

44、ch should be determined based on the standard value determined through this code in accordance with current national standard “Code for building foundation design〞 (GBJ 7). For foundation that requires improvement, the standard value of soil bearing capacity should be determined through examination

45、after the improvement. For soil with increased load, standard value of soil bearing capacity should be determined through examination before load is increased. For buildings with stabilized settlement, when adding stories, article 8.2 of this code may be referred to determine standard value of soil

46、bearing capacity. When the eccentric load works, besides meeting the requirement of formula 5.1.1-1, the following formula should be met as well. pmax<=1.2f (5.1.1-2) Where, pmax – design value of maximum pressure along the bottom of foundation after improvement

47、 or increased load. Pressure at the bottom of foundation after improvement or increased load may be determined through the following formula When the axial load works, p=(F+G)/A (5.1.2-1) Where, F – design value of vertical force on the top of foundation from

48、 upper structure after improvement or increased load G – design value of foundation weight and soil weight on top of foundation. If below water level, floating force should be deducted. A – foundation bottom area When the eccentric load works, pmax = (F+G)/A + M/W (

49、5.1.2-2) pmin = (F+G)/A - M/W (5.1.2-3) Where, M – design value of moment applied to the bottom of foundation after improvement or increased load W – sectional modulus of foundation bottom after improvement or increased load. pmin – design value of minimum pressure

50、along foundation bottom after improvement or increased load. When there is weak underlying layer within the bearing layers of foundation, the bearing capacity of weak underlying layer should be calculated. For existing buildings on a slope or adjacent to deep foundation pit, soil stability

51、 should be calculated as well. 5.2 Calculation of Soil Deformation The calculated value of soil deformation after improvement or inreased load should not exceed the allowable value in the current national standard “Code for Building Foundation Design〞 (GBJ 7). The final settlement of f

52、oundation for existing building after soil and foundation improvement or increased load shall be determined through the following formula. s=s0+s1+s2 (5.2.2) Where, s – final settlement of foundation s0 – settlement achieved before improvement or increased lo

53、ad, which can be determined through settlement observation information or estimated according to local experience. s1 – settlement achieved after improvement or increased load. If soil and foundation are improved, the value can be calculated with the compression modulus after improvement. If the lo

54、ad is increased, the value can be calculated with the compression modulus before increased load. s2 - settlement to be achieved under original building load. The value can be estimated based on the settlement observation information or local experience. If the foundation settlement under original b

55、uilding load is stabilized, then the value should be zero. Calculation of foundation settlement may be referred to the current national standard “Code for Building Foundation Design〞 (GBJ 7). 6 Methods for Improvement of Soil and Foundation 6.1 Mortar Filling Method 6.1.1 The meth

56、od is applicable when cracks are found in foundations due to uneven settlement, frost heaving or other reasons. When the method is applies, first drill a hole at the crack. The filling tube can be 25mm in diameter. Angle between the hole and the horizon should be no less than 30 degrees. The di

57、ameter of the hole should be 2-3mm greater than the diameter of the filling tube. The distance between holes may be 0.5 to 1.0 meter. Cement Mortar can be used as filling material. Filling pressure can be 0.1 to 0.3 Mpa. If the mortar is not going inside, the pressure maybe increased to 0.6 Mpa

58、 slowly. If the filling material is not going inside for 10 to 15 minutes, filling can be stopped. The effective diameter of filling is 0.6 to 1.2 meters. For single foundations, holes on each side of the foundation should be no less than two. For strip foundations, construction should be carri

59、ed out by sections, with each section between 1.5 to 2.0 meters. 6.2 Foundation Bottom Enlargement Method When the bearing capacity of the foundation or the size of the foundation for the existing building can not meeting design requirement, foundation bottom enlargement method can be adopt

60、ed. Concrete or reinforced concrete may be used to make the bottom of foundation bigger. The design and construction should meet the following requirements when making the bottom of foundation bigger. 1. If the foundation is under eccentric load, asymmetrical enlargement can be adopted while if

61、the foundation is under central load, symmetrical enlargement. 2. The surface of original foundation should be made rough and washed clean, and a layer of high-strength cement mortar or concrete agent to increase the adhesive force of old concrete foundation and new concrete foundations. 3. For

62、the enlarged area, a compacted blinding layer of the same thickness and materiel as the original blinding should be used. 4. When using concrete to improve the foundation, the dimension of added concrete should meeting the allowable height and width ration for stiff foundation stipulated in the cu

63、rrent national standard “Code for Building Foundation Design〞 (GBJ 7). Anchor re-bar should be placed at certain distance along the height of the foundation. 5. When using reinforced concrete to improve the foundation, the main re-bars in the added part should be welded to the main re-bars in the

64、original foundation. 6. For the improvement to strip foundation, sections of 1.5 to 2.0 meters should be planned, and construction should be carried by batches and sections at different times. When concrete or reinforced concrete is not suitable for making the bottom of foundation bigger, sing

65、le foundation may be changed into strip foundation, original strip foundation to cross strip foundation or raft foundation, or original raft foundation to box foundation. 6.3 Foundation Deepen Method The method is applicable when good subsoil layer exists near grade, which can be used as be

66、aring layer, and with low water table. Make the original foundation deeper, so that it sits on a better bearing layer to meet the bearing and deformation requirements of the design. When the water table is high, dewater or draining measures should be carried out. The following steps should be observed when making foundation deeper. 1. Excavate a 1.2 meter long, 0.9 meter wide vertical pit along the foundation of existing buildings by sections or batches. If the pit wall can not be uprig

展開閱讀全文
溫馨提示:
1: 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

相關(guān)資源

更多
正為您匹配相似的精品文檔
關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號(hào):ICP2024067431號(hào)-1 川公網(wǎng)安備51140202000466號(hào)


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺(tái),本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請(qǐng)立即通知裝配圖網(wǎng),我們立即給予刪除!