【機(jī)械類畢業(yè)論文中英文對照文獻(xiàn)翻譯】MDL-50A型錨固鉆機(jī)使用說明書【word英文4507字12頁word中文翻譯6171字9頁】
【機(jī)械類畢業(yè)論文中英文對照文獻(xiàn)翻譯】MDL-50A型錨固鉆機(jī)使用說明書【word英文4507字12頁word中文翻譯6171字9頁】,機(jī)械類畢業(yè)論文中英文對照文獻(xiàn)翻譯,word英文4507字12頁,word中文翻譯6171字9頁,機(jī)械類,畢業(yè)論文,中英文,對照,對比,比照,文獻(xiàn),翻譯,mdl,50,錨固,鉆機(jī),使用,說明書,仿單,word
MDL-50A型錨固鉆機(jī)使用說明書
MDL-50A Drilling Rig Operation
China is the world's first national machinery development. Chinese mechanical engineering technology not only has a long history and splendid achievements in Chinese is not only the material culture and social economic development plays an important role in the world, and has made great contribution to promote the progress of technology civilization . Machine in the traditional,our country within a long period are leading in the word. In modern times, especially from the early 18th century, to the 19century40s, due to the economic and social and many other reasons, the machinery industry of Chinese was stagnation, but the 100 years is western bourgeois political revolution and industrial revolution time, mechanical science and technology is developing rapidly, and far more than the level of China. So, China mechanical development level and the western gap widens, to the 19th century middle, our country already behind western more than one hundred years.
Over the past 40 years, roof bolter of China are developing from nothing, in some places roof bolter were also called anchor rig, the varieties from the original single to variety, from single power to multiple power. Our country successively has developed a mechanical support leg type electric roof bolter, drill roof bolter, supporting leg and the guide rail type hydraulic pressure roof bolter, supporting leg type pneumatic roof bolter, non-mechanical transmission support leg electric roof bolter, airborne roof bolter and double-stage Air-leg drill etc.. According to the main power source, roof bolter has two kinds - Pneumatic and hydraulic. But electro-hydraulic combination will be the trend of its development.
Over the past 40 years, roof bolter of China are developing from nothing, in some places roof bolter were also called anchor rig, the varieties from the original single to variety, from single power to multiple power. Our country successively has developed a mechanical support leg type electric roof bolter, drill roof bolter, supporting leg and the guide rail type hydraulic pressure roof bolter, supporting leg type pneumatic roof bolter, non-mechanical transmission support leg electric roof bolter, airborne roof bolter and double-stage Air-leg drill etc.. According to the main power source, roof bolter has two kinds - Pneumatic and hydraulic.
Hydraulic roof bolter is mainly component of the medium of hydraulic oil and the drive actuator witch is including cylinder and motor. Pointing from the walking in the domestic the hydraulic roof bolter mainly has two kinds –skid and crawler. Structure of skid hydraulic Roof bolter is simple, but the strength is higher, operation is simple, manufacturing cost is relatively low. Such as Wuxi dual-fan production of YG-80, Chengdu Hamma production of YXZ-70, Chongqing prospecting plant production of MGJ-50 etc… Holing main technology is double eccentric, commonly used in drill pipe isΦ73, Φ89, according to different design of jacket tube drill pipe commonly useΦ108, Φ127, Φ146 etc specifications. They need to be equipped with proper air compressor to driven impact power, because the bottom of impact always role in the hole, so often be called as "blow". Anti-floating anchor, excavation, soil nail wall support are widely used in workers of the construction process. But they are moving heavy, function single, and increased with the processing costs, much higher and higher buildings, this kind of type has been unable to meet the needs of the market. So anchor bolt drill and tracked automatically walking got quickly development. In the domestic there are many types of the crawler roof bolter, which features in the main power head adopts the high torque motor drive, speed range usually is variable speed. They are greatly improving the rig performance. The track is driven by a hydraulic motor, which made the drilling machine more flexibility and reduces the complex of the artificial joint. This type of drill also adopted the "attack" mode, such as the Oriental industrial production of DF-3000, Xuanhua Ingersoll-Rand production of CM-351. This type of drill same with the slide drill on the pulling sleeve also need be equipped with auxiliary equipment and other auxiliary equipment. In China there is a kind of double anchor rig power head roof bolter, characteristic of this kind of drill rig is drill pipe and casing are driven rotation by each power head, and do not influence each other, pull casing can be done automatically by the machine.
Every rig all have they own operation manual. The follow is MDL-50A Drilling Rig operation manual.
1. Preface
The company has adopted its latest assembling technology for all main parts and components of this product. And the rig is completed with chassis for pretrial and pipe wrench and other accessories, which the re-designed fully new hydraulic system incorporates into one entity. Key elements are all renowned brands either local or imported, and are fully hydraulically controlled and displayed through instruments. The drilling rig is easy and flexible of operation and has high working efficiency and so well meets the requirements by the customer.
MDL-50A Drilling Rig is a new type fully hydraulic long-stroke anchored drilling-rig for engineering purposes developed and manufactured by Jiangsu Wuxi Mineral Exploration Machinery General Factory Co. LTD (formerly Jiangsu Wuxi Mineral Exploration Machinery General Factory).
MDL-50A Drilling Rig is a hydraulically controlled, anchored power head engineering drill. Its overall weight is under 4000kg, is mainly for the anchoring engineering of coast and dangerous rock/cliff mass for geological disaster prevention activity, and the anchoring engineering of rock body etc to control displacement of buildings, and also for supporting of deep-foundation pit and groundwork reinforcing engineering in urban construction site, for blowing up engineering or blowing up hole etc. But the Drilling Rig isn’t suitable for anchoring engineering of high-edge slope or dangerous rock body.
MDL-50A Drilling Rig possesses the characteristics of stable performance, high working efficiency, multiply usage, as well as the capability of drilling sophisticated stratum and handling accidents etc. This drilling rig, deployed by common alloy drill tools or other drill tools, can perform revolving-and-drilling. In the rigid rock stratum, the drilling rig deploys the spheroid drill bit to perform striking and revolving and drilling to have high-speed-bored hole; if deployed with air-compressor and pneumatic in-the-hole hammer, and accepted the cannula-followed drill tools, the drilling rig can drill the hole with cannula together in those unstable stratum such as conglomerate stratum.
Following are the main features of the drilling rig:
1) Compact in structure, fully hydraulically controlled, easy and flexible of operation and easy to move, good mobility, time- saving and energy-saving.
2) Fitted with exclusive drilling follow-up devices (drill rod, thimble, and eccentric drill bit etc). When drilling in unstable stratum thimble can be used at collaring and the hole can be finished with conventional ball teeth bit to achieve good drilling efficiency and good quality holes.
3) Optimized heat diffusion system in the light of customer’s plant conditions to ensure that the max temperature in the hydraulic system does not exceed 70℃ when outdoors temperature reaches 50℃.
4) Power head of the drilling rig has big torque and long stroke with high drilling efficiency, which greatly enhances working efficiency. Fitted with devices for mechanically mounting/dismounting drilling rod to reduce the operators’ labor intensity.
2. Technical Specification
Main drilling mode of this product is: conventional drilling, alloy bit drilling, and spiral drilling
1) Hole dia.(mm):φ85-φ160
2) Hole depth(m):40-60
4) Boring angle(°): -15-90
5) Rated speed(r/min):12、25、45、60、90、125
6) Rated lift capacity(kN):42.5kN
7) Rated pull down capacity(kN):25kN
8) Feed stroke(mm):1800
9) Dynamic:Motor,18.5kw+11kw+1.5kw
10) Weight(kg):4000
11) Shape (L×W×H,mm) :4200×2000×7200
12) Plumb condition:3800×1800×3600
13) Transport state:3800×1800×2000
3. Structure of the Drilling Rig
MDL-50A drilling rig comprises of the following main components:
(1)The power assembly
The power module is made up of three electric motors which respectively drive three sets of pumps. Among them, one group is a double gear pump. The big one is responsible for drilling quickly of the drill; and the small one is responsible for the movement and the support of one side of crutch as well as the medium-speed, low-speed drilling. One set of pump is responsible for the movement and the support of another side of crutch and the medium-speed drilling as well as the quickly lift of the power head. The last set of pump is responsible for the rise of the tower. When you start operating the drill, you should notice the rotated direction of three electric motors, its turning should be identical with the red arrow on the pump or the back shell of the motors, or the drill can't work normally.
(2)The power head assembly
Power head of MDL-50A type drilling rig is driven by Double hydraulic motor through gear box transmission and speed regulating, and it drives the main shaft and fore end drilling rod connection to turn in positive/reverse directions, thereby driving the drilling bits below.
In the power head box is stored gear oil. When in operation be sure to check the oil level from time to time to see there is sufficient oil. On the side of the box is fitted an oil level threaded plug. Just by raising the mast to vertical position and loosening the oil level screw you can check the oil level.
The up/down motion of the power head is effected by the roller assembly beneath it, which is driven by the chains. After the drilling rig has worked for a period of time there will be a certain amount of rocking motion because the roller assembly will have worn. Now is the time to loosen the locking nut and turn the fixing screw of the roller assembly to adjust the sliding clearance between the bottom and the side, then re-tighten the nut. Only be sure you do not tighten the wear- resistant plate excessively.
(3)The propelling rack assembly
This assembly is part of the orifice-supporting device, power head assembly and pressurizing elevation assembly.
(4)The pretrial chassis
With the pretrial fitted on it is possible to effect the drilling rig’s forward/ backward movement and turning and leveling through controlling the proportional pump. and that is why the drilling rig can move easily, has good mobility and is time- saving and energy- saving.
(5)The hydraulic system
Working oil pumps, valves, execution elements and pipe- fittings of the hydraulic system of MDL-50 drilling rig are mostly imported fine quality parts, ensuring a good working performance.
(6)The electrical system
As the drilling rig is not equipped with power generator an external three-phase AC power supply has to be connected to the control cabinet. The motor is started in the planetary triangle mode for the sake of reducing starting current. Total input power of the electrical cabinet is 45 kW. The cabinet is fitted with leakage protection switch as safety device, which also serves as excessive voltage protection for the hydraulic system and for various kinds of warning signals for user to be aware of the rig’s instant status. Before starting be sure to check the cabinet’s earth connection to see it is securely done.
Unqualified personnel are not allowed to do any checkup or maintenance, failing that the person will have to bear the consequences.
4. Operation
Points for attention in the preparation before starting the rig
1.1 The drill should be installed on the flat ground.
1.2 Be sure to tighten all the connections. In case of any loosening be sure to tighten up and make proper adjustments.
1.3 Checking each part if it get stuck or not, checking each shield and oil pipe whether it is installed correctly.
1.4 Checking whether the joy stick is on the close position, make sure it is not on working to prevent any accident.
1.5 Checking whether each connection of vitta is fast, if it is loose, adjusting it.
1.6 Checking the oil if it is enough to achieve the settled level, and making sure that inlet valve and outlet valve is on.
1.7 Clean up the surfaces of all parts and components of the rig. Apply lubricants (oil/grease) to all lubrication nozzles and sliding parts.
1.8 While using the electromotor, paying attention to its turning, its turning should be identical with the escutcheon, and reversion is forbidden.
1.9 Make sure that there is enough oil in the oil box. There is a liquid temperature meter and liquid position meter on the side of oil box. The choice of liquid presses oil: When environment temperature is-10 ~ 40 ℃, you can use L- HM 46(GB 11118.1- 1994) or YB-N 46(GB2512-81); When environment temperature is –40~ -10℃, you can change it to use L-HV 46( GB11118.1-1994) or the other low temperature liquid press the oil. If drill lasts working several days, oil box should be cleaned every month and remove from impurity. The filter in the absorb mouth of the oil pump should be replaced and cleaned each half month.
1.10 Checking whether the oil of the drill is leak or not. And before it is clear, don't drive drill.
1.11 In the cold condition, pump should be open and close by spells for some times. In the heat condition, there should be a shield on top of oil box. (You should settle it by yourself.)
1.12 If drill doesn't work for a long time, oil pump should work without loading for 10 minutes after driving drill. In the moment, the handle is on the middle position, then checking whether the handle is identical to the escutcheon.
1.13 It is forbidden that two joysticks are opposite when power head is rotating after the drill drove.
1.14 Erect the propelling rack assembly. Then fix the longer supporting rod of the supporting assembly together with the supporting base of the propelling rack.
1.15 Try start the drill and checking if the fast add press is in gear. Since the parameter in the escutcheon is confirmed by hydraulic press element in normal condition and also the efficiency of the system is unsure. So the error between the real and the grade parameter in 15% is in gear when the drill is in trial run.
1.16 The drilling Rig can on working after the above movement is in gear.
Points for attention when operating the drilling rig
2.1 Before leaving factory the drilling rig has had its hydraulic system pressure adjusted. So do not change it without approval of the manufacturer. For the sake of safety and prevention of accidents be sure to use your greatest discretion when using excessive system pressure.
2.2 After the propelling rack is erected the ideal thing to do is to remove the rig erecting operation handle in order to prevent mistaken operation.
2.3 Before starting drilling, check the cylinders of the rig’s supporting legs to see they are properly supported.
2.4 While drilling is going on it is not allowed to pull the handle of the supporting leg’s oil cylinders in order to prevent any accidental change to the angle of drilling.
2.5 When power head is close to either extreme position near the end it is not allowed to have any quick motion. Any great impact is to be avoided.
2.6 The drilling rig is fitted with protection against overload pressure and with overload warning. When hydraulic system is overloaded the rig will automatically cut off power to motor and issue warning. Now you will have to find out the cause of overload and remove it before starting the drilling rig again.
Warning:
1)The power head function of quick feed-in and elevation can only be used when operating and coordinating have become really skilled; otherwise accident may happen.
2)When operating simultaneously the power head feed-in and elevation handles, there must not be simultaneous working in opposite directions, which may cause damage to the system
5. Normal Failure & Its Shooting Method
1)Normal faults and remedies of the hydraulic pump
Phenomenon
Analysis
Remedy
No oil, The oil measure is Insufficient, the pressure is not enough
1. The electromotor turnaround worry
1. Check the electromotor turnaround
2. Suction pipe or filter blocked
2. Dredge pipe, clean filter, replace oil
3. Too large clearance between shafts or radials
3. Check and replace relevant parts
4.Leakage in joints, air interfused
4. Screw down bolts on joints,remove the leakage, prevent air into
5. High viscosity of the hydraulic oil or too high oil temperature of hydraulic oil
5. Select the correct hydraulic oil,and control oil temperature
The noise is serious, the pressure wave is severe
1. Suction pipe or filter blocked, or too small with filter content
Clean filter for the suction pipe smooth, select the correct filter
2. The seal of suction pipe blow by or there is air bubble in the oil
Add oil in the conjunction part or seal place, if the noise let up, can screw down conjunction part or replace to seal ring; Return pipe nozzle should be below the oil, and have the certain distance with suction pipe.
3. Pump and the joint cardo is not concentric
Adjust concentric
4. Insufficient oil
Add oil
5. High viscosity of the hydraulic oil or low oil temperature of hydraulic oil
Heat oil to the appropriate temperature
6. Pump bearings mangle
Check the temperature of pump bearings(Use hands to feel that)
2)Normal faults and remedies of hydraulic cylinders
Phenomenon
Analysis
Remedy
Crawl
Air incursion
1. Increase vent-pipes; If there is no exhaust, can run the hydraulic system with the longest journey to make the work parts fast run, force releasing air.
The seal ring of hydraulic cylinders end cover press too tight or too loose.
2. Adjust the seal ring, make it not loose and not tight, and the piston pole can be ensured to placidly draw it by hand but no leakage( Mostly admit to leak tiny oil)
The piston pole and the piston have not concentric
3. Correct concentricity between the piston pole and the piston
The span or part of piston pole bend
4. Alignment the piston pole
The installation position of hydraulic cylinders move
5. Check and correct the parallel between the hydraulic cylinder and the lead rail
The linearity of the hydraulic cylinder inner hole is bad( The drum taper etc.)
6. Renovate the hydraulic cylinder with milling and boring, and match piston again.
7. Canker the cylinder ,or wear away the cylinder wall
7. It removes rust and burr that it is slight, it must bore and mill that it is serious.
8. Both sides screw caps of double piston poles are tweaked too tight, and make its concentricity be bad
8. The screw caps should not be tweaked too tight, can tweak them with hand generally, then keep the piston to be placed in nature.
Impingement
Too large clearance between pistons and hydraulic cylinders that used clearance seal, the throttle lose the effect of throttle.
The clearance between pistons and hydraulic cylinders should be matched with the provision, and reduce the leakage phenomenon.
The cushion check valve of the end is failure, and can not react the cushion.
Revise and match the check valve with the valve holder
he thrust lack or the work speed gradually descend even to stop
Too large the coordination clearance between the hydraulic cylinder and the piston or O seal ring damage, and result the high and low-pressure cavity to connect with each other
1. Match the clearance between the piston and the hydraulic cylinder or replace the O seal ring
Because a certain section of the work journey was used usually on the working hours, and result in the linearity of the hydraulic cylinder hole bad( Have the drum form p
收藏