錢營(yíng)孜礦1.5Mta新井設(shè)計(jì)【含CAD圖紙+文檔】
錢營(yíng)孜礦1.5Mta新井設(shè)計(jì)【含CAD圖紙+文檔】,含CAD圖紙+文檔,錢營(yíng)孜礦,mta,設(shè)計(jì),cad,圖紙,文檔
摘 要
一般部分針對(duì)錢營(yíng)孜礦井進(jìn)行了井型為1.5Mt/a的新井設(shè)計(jì)。錢營(yíng)孜礦井位于安徽省宿州市境內(nèi),井田走向長(zhǎng)約7.0km,傾向長(zhǎng)約5.3km,面積約37.1km2。主采煤層為32煤層,平均傾角12~15°,平均厚度2.89m。井田工業(yè)儲(chǔ)量為216.6Mt,可采儲(chǔ)量161.0Mt,礦井服務(wù)年限為71.6a。礦井正常涌水量為434m3/h,最大涌水量為885m3/h。礦井相對(duì)瓦斯涌出量為2.5m3/t,絕對(duì)瓦斯量10 m3/min,屬低瓦斯礦井。
根據(jù)井田地質(zhì)條件,設(shè)計(jì)采用立井兩水平開拓方式,主井暗斜井延深,副井、中央風(fēng)井立井直接延深,軌道大巷、膠帶機(jī)運(yùn)輸大巷和回風(fēng)大巷皆為巖石大巷,布置在32煤層底板巖層中。一水平標(biāo)高-480 m,二水平標(biāo)高-700 m。
西二采區(qū)采用了采區(qū)準(zhǔn)備方式,共劃分為五個(gè)工作面,并進(jìn)行了運(yùn)煤、通風(fēng)、運(yùn)料、排矸、供電系統(tǒng)設(shè)計(jì)。
針對(duì)32202工作面進(jìn)行了采煤工藝設(shè)計(jì)。該工作面煤層平均厚度為2.89 m,平均傾角12.6°,直接頂為的砂質(zhì)泥巖,老頂為細(xì)砂巖。工作面采用長(zhǎng)壁綜采一次采全高采煤法。采用雙滾筒采煤機(jī)割煤,往返一次割兩刀。采用“三八制”工作制度,截深0.8 m,每天八個(gè)循環(huán),循環(huán)進(jìn)尺6.4m,月推進(jìn)度192 m。
大巷采用膠帶輸送機(jī)運(yùn)煤,輔助運(yùn)輸采用蓄電池式電機(jī)車牽引固定箱式礦車。主井采用兩套帶平衡錘的16 t箕斗提煤,副井采用一對(duì)1.0 t礦車雙層四車窄罐籠和一個(gè)帶平衡錘的1.0 t礦車雙層四車寬罐籠運(yùn)料和升降人員。
專題部分題目是《巖層控制的柔性關(guān)鍵層理論》, 通過(guò)分析上覆巖層的破斷規(guī)律,定義了柔性關(guān)鍵層,分析出了柔性關(guān)鍵層對(duì)關(guān)鍵層復(fù)合破斷和礦壓顯現(xiàn)的影響。
翻譯部分題目是《Effects of Bolt-plate Arrangements on Steel Plate Strengthened Reinforced Concrete Beams》。
關(guān)鍵詞:錢營(yíng)孜礦;立井開拓;暗斜井;采區(qū)布置;中央并列式;柔性關(guān)鍵層
ABSTRACT
The general design is about a 1.50 Mt/a new underground mine design of Qianyingzi coal mine. Qianyingzi coal mine is located in Suzhou, Anhui province. It’s about 7.0 km on the strike and 5.3 km on the dip, with the 37.1 km2 total horizontal area. The minable coal seam is 32with an average thickness of 2.89 m and an average dip of 12~15°. The proved reserves of this coal mine are 216.6 Mt and the minable reserves are 161.0 Mt, with a mine life of 71.6 a. The normal mine inflow is 434 m3/h and the maximum mine inflow is 885 m3/h. The mine gas emission rate is 2.5 m3/t and 10 m3/min which can be recognized as low gas mine.
Based on the geological condition of the mine, this design uses a vertical shaft two-level development method. The extension of the main shaft is blind inclined shaft and the extension of auxiliary shaft and central ventilation shaft is vertical shaft. Track roadway, belt conveyor roadway and return airway are all rock main roadways, arranged in the floor rock of 32 coal seam.. The first level is at -480 m. The second level is at -700 m.
The design applies district preparation against the first district of West Two which divided into five longwall faces totally, and conducted coal conveyance, ventilation, gangue conveyance and electricity designing.
The design conducted coal mining technology design against the 32202 face. The coal seam average thickness of this working face is 2.89 m and the average dip is 12.6°, the immediate roof is mud stone and the main roof is sand stone. The working face applies fully mechanized longwall full-height coal caving method, and uses double drum shearer cutting coal which cuts twice each working cycle. "Three-Eight" working system has been used in this design and the depth-web is 0.8 m with eight working cycles per day, and the advance of a working cycle is 6.4 m and the advance is 192 m per month.
Main roadway makes use of belt conveyor to transport coal resource, and battery locomotive to be assistant transport. The main shaft uses double 16 t skips to lift coal with a balance hammer and the auxiliary shaft uses a double narrow1.0 t four-car double-deck cage and a wide 1.0 t four-car double-deck cage to lift material and miners.
The monographic study entitled "The Flexible Dominant Stratum Theory of Strata Control ". By analyzing the breaking law of overburden, the flexible dominant stratum is defined. The paper has analyzed the effects of the flexible key layer on the dominant stratum composite breaking and the pressure behavior of mine.
The title of the translated academic paper is "Effects of Bolt-plate Arrangements on Steel Plate Strengthened Reinforced Concrete Beams ".
Keywords: Qianyingzi coal mine; Vertical shaft development; Blind inclined shaft; Mining district preparation; The central paratactic type; The flexible dominant stratum
收藏
編號(hào):1737229
類型:共享資源
大?。?span id="ievbyqtbdd" class="font-tahoma">7.49MB
格式:ZIP
上傳時(shí)間:2019-11-04
50
積分
- 關(guān) 鍵 詞:
-
含CAD圖紙+文檔
錢營(yíng)孜礦
mta
設(shè)計(jì)
cad
圖紙
文檔
- 資源描述:
-
錢營(yíng)孜礦1.5Mta新井設(shè)計(jì)【含CAD圖紙+文檔】,含CAD圖紙+文檔,錢營(yíng)孜礦,mta,設(shè)計(jì),cad,圖紙,文檔
展開閱讀全文
- 溫馨提示:
1: 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學(xué)習(xí)交流,未經(jīng)上傳用戶書面授權(quán),請(qǐng)勿作他用。